by Center for Design and Development(C-D&D) of Chittaranjan Locomotive works --------
************Progress of Ongoing Projects regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW**********
Achievements in the month of December 2014
1. 1st WAP-5 locomotive 30082 fitted with IGBT based
Traction converter, Auxiliary converter and TCN VCU of M/s. BHEL and dispatched to ELS/BRC.
2. Commissioning of 2nd set of IGBT based Propulsion system of M/s Medha completed on Loco No. 31549.
3. 1st WAG 9H locomotive 31563 with Prototype unit of IGBT based Auxiliary converter of M/s HIRECT and dispatched to ELS/GMO.
4. Field trial of M/s. Medha make Hotel Load Converter fitted in loco no. 30375 (WAP-7) completed successfully on NDLS-Kalka Shatabdi alongwith RDSO representatives.
5. IGBT based Traction converters & Auxiliary Converter provided on 13 locomotives & 14 locomotives respectively during Dec.’14 at CLW.
Targets for the month of January 2015
1. Commissioning of Hotel load converter supplied by M/s Siemens on Loco No. 30406.
2. Commissioning of Hotel load converter supplied by M/s BHEL on Loco No. 30426.
3. Commissioning of 3rd & 4th set of IGBT based Propulsion systems supplied by M/s Medha on Loco No. 31557 and 31559.
4. Finalisation of new software version for WAG9/WAP7 locomotives incorporating driver display, VCU redundancy and other reliability improvement features.
5. STRs of Auxiliary Converter, VCU & Transformer for 3-Ph locomotives to be finalized after receipt of comments from RDSO.
6. Finalisation of specification for IGBT based Traction, Auxiliary converter and VCU.
For more details of the progress of this project please visit:
click hereA total number of 191(One Hunderd Ninety One)IGBT Loco turned out from CLW during the period (01.04.2012 to 31.12.2014). For all the details of these 191 3 Phase AC Electric Locomotives( Like: Serial Number, Type of the Loco, CLW No of Each Loco, Loco No of each loco,Rail Zone where allotted, Sheds where allotted, Despatch date of each loco from CLW etc) please visit the following link:
click hereOnly 4 IGBT Locos are despatched from CLW prior to 01.04.2012. For details of these 4 Locos(Like: Serial Number, Type of the Loco, CLW No of Each Loco, Loco No of each loco,Rail Zone where allotted, Sheds where allotted, Despatch date of each loco from CLW etc) please visit the following link:
click here Attached Image:
1 AJNI WAP 7 30315(CLW NO of this loco: TPP-115 Despatch Date from CLW: 30.06.12)
Source:
click here IGBT Loco Issues:
As IGBT Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL and assembled by CLW in the 3 Phase Locomotives so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco.Please see the three attached "Excel Spreadsheets" to know about the Issues regarding IGBT Locomotives(3 Phaser specially WAP7,WAG 9, WAG 9H & WAG 9i). You can see the "Comment of RDSO" against "Each Issue" addressed to "ABB"in the last column of first Excel Spreadsheet and in other two excel spreadsheets you can see the "status of the issue" and "Firm's Comment about the issue" in the last column of the Excel Spreadsheet .
Attached Excel Worksheets:
3 IGBT LOCO ISSUES WITH ABB.xls(Extracted from the Official Website of CLW)
4 IGBT LOCO ISSUES WITH BHEL.xls(Extracted from the Official Website of CLW)
5 IGBT LOCO ISSUES WITH BTIL.xls(Extracted from the Official Website of CLW)
*** Please download the "Excel Spreadsheets" for seeing the issues of IGBT Locos.
This is "A Compact Information" about 3 Phase Locos(Specially: WAP 7, WAG 9, WAG 9H & WAG 9I) presented here from the Official Website of CLW.
Thanks