Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 21 06:59:52 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Filters:

Page#    267 Blog Entries  <<prev  next>>
Rail News
58162 views
3

New/Special Trains
SER/South Eastern
Sep 06 (09:09)   Four Vande Bharat Trains Inaugurated in Jharkhand by Prime Minister Modi

Rail_Mitra_Mj^~   26 news posts
Entry# 6180430         Tags   Past Edits
टाटा से पटना के लिए सुबह 6 बजे और बरहमपुर के लिए 5.20 बजे खुलेगी वंदे भारत, झारखंड को कुल 4वंदे भारत का तोहफा, जानें क्या है रूट

Prime Minister Narendra Modi will inaugurate four Vande Bharat trains from Jamshedpur on September 15th. Notably, all four Vande Bharat trains are dedicated to Jharkhand. He will flag off the Tata-Patna and Tata-Berhampur Vande Bharat trains at Tatanagar station. Additionally, he will flag off the Deoghar-Varanasi and Dumka-Ranchi Vande Bharat trains...
more...
online. The timetable for Tata-Patna and Tata-Berhampur Vande Bharat trains is almost finalized. The Tata-Patna Vande Bharat Express will depart from Tatanagar at 6:00 AM and arrive at Tatanagar at 1:00 PM. It will depart again from Tatanagar at 2:00 PM and arrive at Tatanagar at 9:00 PM. The Tata-Berhampur Vande Bharat Express will depart from Tatanagar station at 5:20 AM and arrive at Berhampur at 2:30 PM. This train will pass through Chaibasa, marking the first Vande Bharat Express service for Chaibasa. The train will depart from Tatanagar at 5:20 AM, reach Chaibasa at 6:10 AM, Dongwaposhi at 7:00 AM, and then continue to Bhubaneswar, Khurda Road, before reaching Berhampur. It will depart from Berhampur at 3:00 PM and arrive at Tatanagar at 11:55 PM. The Tata-Patna Vande Bharat Express will travel from Tatanagar via Purulia, Anara, Bhojudih, Gomoh, Koderma, and Gaya. On the same day, the Prime Minister will virtually flag off the Deoghar-Varanasi and Dumka-Ranchi Vande Bharat trains. The Deoghar-Varanasi Vande Bharat train will depart from Deoghar at 3:15 PM and reach Varanasi station at 10:20 PM via Jasidih, Jhajha, Nawada, and Gaya. It will depart from Varanasi at 6:20 AM and reach the Baidyanath Dham station at 1:30 PM. The Dumka-Ranchi Vande Bharat train will travel via Deoghar, Madhupur, New Giridih station, Rajdhanwar, Koderma, Barhi, and Hazaribagh before reaching Ranchi. The timetable for this train is not yet available. The state of Jharkhand is slated to hold assembly elections in the coming months, and the Prime Minister is presenting Jharkhand with four Vande Bharat Express trains as a gift. Preparations for the Vande Bharat Express are in full swing at the Tatanagar station. Trial runs will be conducted soon.

Prime Minister Narendra Modi 15 September ko Jamshedpur se chaar Vande Bharat trains ka haree jhandi dikhakar shubhaarambh karne waale hain. Khaas baat yeh hai ki yeh chaar Vande Bharat trains Jharkhand ko hi samarpit hai. Ve Tatanagar station par Tata-Patna aur Tata-Berhampur Vande Bharat ko haree jhandi dikhaenge. Saath hi...
more...
saath Deoghar-Varanasi aur Dumka-Ranchi Vande Bharat ko bhi haree jhandi dikhaenge. Is beech Tata-Patna aur Tata-Berhampur Vande Bharat ki samay sarani bhi lagbhag tay ho gayi hai. Patna ke liye Tatanagar se subah 6:00 baje Vande Bharat Express khulegi aur dopahar 1:00 baje Tatanagar pahuchegi. Dopahar 2:00 baje Tatanagar se khulkar raat 9:00 baje Tatanagar aayegi. Tata-Berhampur Vande Bharat Express subah 5:20 baje Tatanagar station se ravana hokar 2:30 baje Berhampur pahuchegi. Khaas baat yeh hai ki yeh train Chaibasa hokar jaayegi. Is tarah Chaibasa ko pehle Vande Bharat Express ka tohfa milne ja raha hai. Tatanagar se subah 5:20 baje khulkar yeh train 6:10 baje Chaibasa 7:00 baje Dongwaposhi, Bhubaneswar, Khurda Road hote hue Berhampur pahuchegi. Berhampur se dopahar 3:00 baje khulkar raat 11:55 baje yeh train Tatanagar pahuchegi. Tata-Patna Vande Bharat Express Purulia, Anara, Bhojudih, Gomoh, Koderma, Gaya ke raste Tatanagar se jaayegi. Usi din Pradhaanmantri Deoghar Baba Baidyanath se Kashi Vishwanath Banaras ke liye aur Dumka se Ranchi ke liye Vande Bharat ki online haree jhandi dikhaenge. Mili jaankaari ke anusar kuchh aur trains ko bhi haree jhandi dikhane ki sambhavna hai. Halanki iski abhi jaankaari nahin aayi hai. Vande Bharat train Deoghar se 3:15 baje khulkar Jasidih, Jhajha, Nawada hote hue shaam 7:10 baje Gaya hote hue raat 10:20 baje Varanasi station pahuchegi. Varanasi se subah 6:20 baje khulegi aur 1:30 baje Baidyanath Dham station pahuchegi. Dumka-Ranchi Vande Bharat train Deoghar, Madhupur, New Giridih station, Rajdhanwar, Koderma, Barhi, Hazaribagh hote hue Ranchi jaayegi. Is train ki samay sarani abhi samne nahin aayi hai. Jharkhand mein aagle kuchh mahino mein vidhansabha chunav hone waale hain aur ise dekhte hue Jharkhand ko ek saath chaar Vande Bharat Express ka Pradhaanmantri tohfa dene ja rahe hain. Tatanagar station par Vande Bharat Express ko lekar taiyaariyan zoron par hai. Iska trial bhi jaldi kiya jaayega.

6 Public Posts - Fri Sep 06, 2024

2348 views
0

Sep 06 (11:17)
deepak.yerr~
deepak.yerr~   6643 blog posts
Re# 6180430-7              
Ranchi Varanasi us survinving in occupancy because of Gaya. half the occupancy comes from here andctrain completed 60% distance already. Can it take one more VB and give numbers? Only respite is it's in opp direction.
Translate to English
Translate to Hindi

56 Public Posts - Fri Sep 06, 2024
1 Followers
Rail News
69743 views
4

New/Special Trains
NR/Northern
Aug 29 (07:54)   Chetak Express to Connect Chandigarh with Udaipur, Starting in September

intransit~   7 news posts
Entry# 6171863         Tags   Past Edits
Ambala division finally gives green signal to Chandigarh-Udaipur train

The Ambala division of the Indian Railways has approved the extension of the Chetak Express (train number 20474) from its current route between Udaipur and Delhi Sarai Rohilla to Chandigarh. The train is expected to commence operations by the first week of September. The train will depart from Udaipur at 3:45...
more...
PM and arrive in Chandigarh at 9:15 AM, staying there for the entire day before returning to Udaipur. The route includes stops at Chittorgarh, Bhilwara, and Ajmer Sharif, offering travelers the opportunity to visit various tourist destinations.

Ambala division ne Chandigarh se Udaipur tak Chetak Express (20474) ko chalaane ki permission de di hai. Train September ke pehle hafte mein start hone wali hai. Udaipur se train 3:45 PM pe chalegi aur Chandigarh 9:15 AM pe pahunchegi. Train saare din Chandigarh mein rahegi aur phir Udaipur vapas jaayegi....
more...
Train Chittorgarh, Bhilwara, aur Ajmer Sharif pe rukti hai, aur yah tourists ke liye ek achha experience hoga.

2 Public Posts - Thu Aug 29, 2024

12444 views
1

Aug 29 (16:50)
deepak.yerr~
deepak.yerr~   6643 blog posts
Re# 6171863-3              
Both are different class of trains so wouldnt be a problem. It can be treated as Himalayan Queen intercity express which used to run before covid and not restored. 70% travellers from Udaipur will get down at Delhi and will be good morning intercity for Delhi Panipat.
Translate to English
Translate to Hindi

1 Public Posts - Thu Aug 29, 2024

2 Public Posts - Fri Aug 30, 2024

2 Public Posts - Sat Aug 31, 2024

3 Public Posts - Sun Sep 01, 2024

2 Public Posts - Mon Sep 02, 2024

4 Public Posts - Tue Sep 03, 2024

2 Public Posts - Tue Sep 10, 2024
Rail News
20966 views
3

New Facilities/Technology
CR/Central
Aug 23 (05:58)   Indian Railways Revises Vande Bharat Train Order: 80 Sets with 24 Coaches Each

Sameer2905^~   801 news posts
Entry# 6165549         Tags   Past Edits
1 compliments
Useful
New Vande Bharat trains to have 24 coaches instead of 16; Indian Railways revises Rs 35,000 crore order; check key details

The Indian Railways has revised its Vande Bharat train order. Originally planned for 120 sets with 16 coaches each, the order has been changed to 80 sets with 24 coaches each. The first prototype of the new model is expected in September 2025, followed by the second in November. This new...
more...
train will be manufactured by Kinet Railway Solutions, a joint venture of RVNL, Metrowagonmash, and LES. The project aims to eventually produce 2,500 high-speed trains by 2047, replacing older train sets. The use of aluminium instead of steel is expected to improve speed and cost efficiency.

Indian Railways ne apne Vande Bharat train ke order mein badlaav kiya hai. Pehle, 120 sets banne the, har set mein 16 coaches the, lekin ab yeh order badal kar 80 sets ho gaya hai, aur har set mein 24 coaches honge. Is model ka pehla prototype September 2025 mein aayega,...
more...
aur dusra November mein. Yeh naya train Kinet Railway Solutions banayega, jo ki RVNL, Metrowagonmash, aur LES ka joint venture hai. Is project ka maqsad 2047 tak 2,500 high-speed trains banana hai, jiske saath hi purane train sets badal diye jayenge. Is mein steel ki jagah aluminium ka istemaal kiya jaayega, jisse speed aur cost efficiency mein sudhaar aayega.

1 Public Posts - Fri Aug 23, 2024

14116 views
1

Aug 23 (09:19)
deepak.yerr~
deepak.yerr~   6643 blog posts
Re# 6165549-5              
IR has changed the length of VB sleeper trains from 16 to 24 coaches and will include luggage vans, pantry car, may be restaurant seating car. So as pantry is included the design of the coach will be changed the present hot buffet arrangements in the coach will pave way for berths. The overall capacity of the train will increase considerable from the earlier 823 traveller berth to over 1200 which means a complete new design from the prototype being manufactured in BEML. The target date next Sep 2025 may be stretched to 2026 Q1 as the design has to start from scratch. The cost of the train set will increase from the present Rs 120 cr per trainset to 180cr which is not mentioned in the article. There is no clear information whether the L2 Titagarh has also been asked to change the specifications for 80 trainsets which has...
more...
already designed the concept, production procuremnt plan and target to roll out in July 2025. The tenders are already are old by an year and IR with RM changes specifications the project will be delayed which is to be on track in T20. (2020).

Translate to English
Translate to Hindi

1 Public Posts - Fri Aug 23, 2024
Rail News
17165 views
5

IR Affairs
SCoR/South Coast
Aug 20 (19:56)   Visakhapatnam Railway Zone Project to Begin Soon After Land Allocation

Exynos9611~   19647 news posts
Entry# 6163465         Tags   Past Edits
Construction of new railway zone headquarters to start in Visakhapatanam soon

The long-awaited Visakhapatnam Railway Zone is finally set to become a reality. The project, approved by the Central government previously, faced delays due to land allocation issues. Recently, the land was allocated, and the project is ready to begin. The new zone will include the existing Guntur and Vijayawada divisions, and...
more...
the Waltair division will be split, with one part becoming part of the new zone and the other becoming a new division. This development comes after the NDA government returned to power in Andhra Pradesh and Chief Minister Chandrababu Naidu negotiated with Prime Minister Narendra Modi for the state's development, including this railway zone project. The project was originally announced in 2019 by the previous Railway Minister Piyush Goyal, and it will cover parts of Andhra Pradesh, Karnataka, Telangana, Tamil Nadu, and Karnataka.

Visakhapatnam Railway Zone aane wala hai! Sabse pahle, land allocation ki wajah se delay ho raha tha, but ab land mil gaya hai. Project start hone wala hai. New zone mein Guntur aur Vijayawada divisions include honge, aur Waltair division ko do hisson mein divide kiya jaayega. Ek hissa new zone...
more...
mein jaayega, dusra hissa new division ban jaayega. Ye sab isliye ho raha hai kiyonki NDA government Andhra Pradesh mein waapas aaya hai aur CM Chandrababu Naidu PM Modi se state ke development ke liye baat kar rahe hain, aur ye railway zone bhi usme important hai. Project 2019 mein announced kiya gaya tha, and ye Andhra Pradesh, Karnataka, Telangana, Tamil Nadu, aur Karnataka ke kuchh hisson ko cover karega.

2 Public Posts - Tue Aug 20, 2024

9337 views
1

Aug 21 (05:18)
deepak.yerr~
deepak.yerr~   6643 blog posts
Re# 6163465-3              
There is no news about alternate site in local page of Eenadu in the past 2 months. The earlier site allocated I'd not suitable for construction as it falls under Reservoir catchment area and doesn't have approach road and is blocked by another site.
Translate to English
Translate to Hindi

2 Public Posts - Wed Aug 21, 2024
Rail News
21976 views
1

IR Affairs
SCR/South Central
Aug 03 (20:02)   MP Purandeswari Addresses Railway Issues in Rajamahendravaram, Announces Development Plans

Exynos9611~   19647 news posts
Entry# 6145377         Tags   Past Edits
Purandeswari: రైల్వే సమస్యలు త్వరగా పరిష్కరిస్తాం

MP Daggubati Purandeswari held a press conference in Rajamahendravaram on Saturday, August 3, 2024, addressing railway issues in the region. She announced plans to improve the East Railway Station, develop Rajamahendravaram Railway Station, establish an R.O.B near Kesavaram, and build a foot over bridge in Anaparthi by January 2027. MLA Gorantla...
more...
Butchchayya Chowdary announced plans to expand East Railway Station Road with private partnership and work on building an underpass at Annapurnammpeta. MLA Nallamilli Ramakrishna Reddy requested more Visakhapatnam trains from Anaparthi between 10 AM to 7 PM and the development of Bikkavolu Railway Station.

MP Daggubati Purandeswari ne Rajamahendravaram mein Saturday, August 3, 2024 ko ek press conference kiya, jisme unhone region ke railway issues ke baare mein baat ki. Unhone East Railway Station ko improve karne, Rajamahendravaram Railway Station ko develop karne, Kesavaram ke paas R.O.B banwane aur January 2027 tak Anaparthi mein foot...
more...
over bridge banwane ki plans announce ki. MLA Gorantla Butchchayya Chowdary ne East Railway Station Road ko private partnership se expand karne aur Annapurnammpeta mein underpass banwane ka kaam karne ki plans announce ki. MLA Nallamilli Ramakrishna Reddy ne Anaparthi se Visakhapatnam ke liye 10 AM se 7 PM ke beech zyada trains chalane aur Bikkavolu Railway Station ko develop karne ka request kiya.

1 Public Posts - Sat Aug 03, 2024

1 Public Posts - Tue Aug 06, 2024

8223 views
0

Aug 06 (13:48)
deepak.yerr~
deepak.yerr~   6643 blog posts
Re# 6145377-3              
More then new line towards Raipur which takes long time technicallly difficult and financially not much viable MP of RJY should stress for 3rd line and bridge on Godavari on existing pier before Pushakaram to be held in 2027 which will have direct impact to public everyday travelling in Vskp VJA section being BJP state president and good relations in Centre.
Translate to English
Translate to Hindi

1 Public Posts - Tue Aug 06, 2024

5381 views
0

Aug 06 (21:51)
deepak.yerr~
deepak.yerr~   6643 blog posts
Re# 6145377-5               Past Edits
1% is nothing they would have considered freight options too in survey. Min ROR required is 14% for new line to be financially viable.The present Kothavalsa Araku doubling of 60km Ghat section remaining will itself take 3 years more as 45 tunnels need to be constructed. This new line will take even more as most of it will be in reserve forest area and Ghat section. GQ, EW, NS corridors of 10,000km is giving 65% of revenue by moving freight and passenger services and its utilization is 150% there is urgent need to increase infrastructure in these lines by adding 3rd and 4th lines and IR is doing it but lacks pace in development.
Translate to English
Translate to Hindi

1 Public Posts - Tue Aug 06, 2024

1 Public Posts - Sat Aug 10, 2024
Page#    267 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6191858 ★★ 23SreeNdl^~
5341825 ★★ 21SreeNdl^~
1959644 ★★★ 270Arpit~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy