#railwayengineering
********* 1100th three phase Electric Locomotive Turned out from CLW on 26.05.2016 *********
So Finally the Toll of 3-Phasers cross 1000 in IR's History.
WAG-9H 31736 the 1100 Locomotive Flagged off on 26.05.2016
Attached...
more... Images:
Shri C.P.Tayal, General Manager, CLW flagging off the 1100th three phase Electric Locomotive
(WAG-9H type, No.31736) of Chittaranjan Locomotive Works on 26-5-16
Dr V.K. Saraswat, Chairman, sitting , being shown around the CLW locomotive
by Shri C.P. Tayal, GM ,CLW, 2nd from left on 20-5-16
Link of attached images:
click here