Electrification Update of MFP-NKE-VKNR & SGL-RXL(Branch line). OHE poles has arrived at sagauli however still erection of poles not started. OHE poles are only spotted at SGL on entire GKP-NKE-MFP route. Most probably first electrification of SGL-RXL will be done later MFP-SGL-VKNR