It's the same problem with a lot of weekly trains. And a loco link from AK would hav to be provided by CR, which does not have many trains of it's own running towards SWM. So, they tend to run such trains with end-to-end Diesel locos. It's more for operational convenience as they need not have to arrange a loco link for one weekly train.