Some AC trains are made to run as the rakes have free turnaround time and IR is not checking the traffic potential iin that direction on that specific day before introduction. They just think we have rake and traffic in particular section or demand to run a new train in that route. This is the result. They don't take swift decisions to contain the loss of operating expenditure.