1. Based on Journey on 31st Ma 2019 I have seen Upto Mangurjan (MXJ) wiring done and wire installation machine was in the station also.
2.After that some discreet place wiring has done. But most of the OHE pole erection work has been done already.
3. In NJP station platform 2,3 and 1 A i have seen some OHE pole. but wiring work has not been observed.