I think there are 2 issues here. 1. The train takes too much time. Solution is to run an EMU like Mumbai local with quick turnaround time which should not take more than 30 minutes. 2. To connect the line to Merta road since it is dead end as of now. Simlar to Bilara line which is loss making as it is not extended till Bar.