Abhi udaipur - chittor section pr
1. Rana pratap nagar pr 1 additional loop line + pf 3 ka kam ho rha h
2. Khemli station pr 4th line ka kam ho gya pr electrification or interlocking ka kam baki h..
3. Bhimal station pr 3rd line or pf 2 ka kam chal ra h..
4....
more... Bhupal sagar station pr 3rd line + pf 2 + station k aage chittor side m loading k lia railway line daal di h..
5. Kapasan pr 3rd line + pf 2 kam kam chl ra h..
6. Pandoli station pr 3rd line + pf 2 ka kam chal rha h..
please wait...Translate to EnglishRight now, work is happening on the Udaipur - Chittor section.
1. In Rana Pratap Nagar, they are working on adding an additional loop line and platform 3.
2. At Khemli station, the work for the 4th line is done, but they still need to do the electrification and interlocking work.
3. At Bhimal station, they are working on the 3rd line and platform 2.
4. At Bhupal Sagar station, they have added the 3rd line, platform 2, and a railway line in front of the station for loading towards the Chittor side.
5. At Kapasan, they are working on the 3rd line and platform 2.
6. At Pandoli station, they are working on the 3rd line and platform 2.