Northeast Frontier Railway Workshops Exceed Maintenance Targets for Train Coaches and Wagons in JulyThe rolling stock workshops at New Bongaigaon and Dibrugarh under Northeast Frontier Railway (NFR) have exceeded their targets for coach and wagon maintenance in July. New Bongaigaon overhauled 64 coaches and Dibrugarh overhauled 59 coaches, surpassing their goals. New Bongaigaon also converted three trolleys to high-speed versions and manufactured 38 items...
more... in-house. Both workshops have upgraded infrastructure to handle LHB coaches and increased their POH capacity. Dibrugarh installed fire detection systems in two LHB AC coaches, bringing the total to 28 for the fiscal year. Both workshops also conducted maintenance activities beyond POH, including Intermediate Overhauling (IOH). New Bongaigaon converted 25 wagons to the Twin Pipe air brake system, bringing the total to 126 for the year. Dibrugarh modified air hoses on seven coaches, reaching a total of 38 for the fiscal year, and modified air brake pipes and fittings on 13 coaches, bringing the total to 49 for the fiscal year.
Northeast Frontier Railway (NFR) ke New Bongaigaon aur Dibrugarh mein, rolling stock workshops ne July mein coach aur wagon maintenance ke target ko beat kiya hai. New Bongaigaon ne 64 coaches ka Periodical Overhauling (POH) kiya aur Dibrugarh ne 59 coaches ka POH kiya, apne target se zyada. New Bongaigaon ne...
more... 3 trolleys ko high-speed trolleys mein convert kiya aur 38 items in-house banaye. Dono workshops ne LHB coaches ke liye infrastructure upgrade kiya aur apni POH capacity badhayi. Dibrugarh ne 2 LHB AC coaches mein Fire Detection Systems (FSDS) install kiye, is fiscal year mein total 28 ho gaye. Dono workshops ne POH ke alawa, Intermediate Overhauling (IOH) jaise aur bhi maintenance activities kiye. New Bongaigaon ne 25 wagons ko Twin Pipe air brake system mein convert kiya, is saal total 126 ho gaye. Dibrugarh ne 7 coaches mein R3 air hose pipes modify kiye, is fiscal year mein total 38 ho gaye. 13 coaches mein air brake pipes aur fittings ko standardized upgraded flexible hoses se modify kiya, is fiscal year mein total 49 ho gaye.