woh toh baad mein hoga SGUJ mein avi toh bas 3 hi PF hain....I wonder there were 2 Metre Gauge PF in SGUJ....but Rly is not looking into those..now as Metre Gauge completely removed either,a Washing Pit should be built across the place otherwise at least a shorter length BG PF has to be built so that min 11-14 coach train can be accomodated.