Central Railway proposes restriction of heavy vehicles on Sion Road Over Bridge(ROB) as safety measure*. *Entry of heavy vehicles to be restricted with effect from 21/22.6.2024 (midnight of Friday/Saturday)*Central Railway has proposed restricting heavy vehicles from using the Sion Road Over Bridge (ROB) due to safety concerns. The ROB is in a poor state and deemed unsafe by the Indian Institute of Technology (IIT), Mumbai. To ensure safety, height gauges with a clearance of 3.60 meters will be installed...
more... on both sides of the ROB starting from midnight of Friday/Saturday, June 21/22, 2024. Central Railway has requested the Traffic department to issue appropriate traffic regulations for road users. The Sion ROB is scheduled to be dismantled and reconstructed as it is in poor condition and hinders the proposed 5th and 6th line construction between CSMT and Kurla. Central Railway requests the public's understanding and apologizes for any inconvenience caused.
Central Railway ne Sion Road Over Bridge (ROB) pe heavy vehicles ko jaane se rokne ka proposal diya hai, safety ke liye. ROB ki condition bahut kharab hai aur IIT Mumbai ne apne structural audit report mein use unsafe declare kiya hai. Safety ke liye, ROB ke dono taraf 3.60 meters...
more... ki clearance wale height gauges lagaaye jaayenge, Friday/Saturday, June 21/22, 2024 ki midnight se. Central Railway ne Traffic department se road users ke liye suitable traffic regulations issue karne ka request kiya hai. Sion ROB ki condition bahut kharab hai aur ye CSMT aur Kurla ke beech proposed 5th aur 6th line ke construction mein bhi rokawat hai, isliye ise dismantle aur reconstruct karne ka plan hai. Central Railway public se sahayata aur samajhne ka request karti hai aur is se hone wali pareshani ke liye khed vyakt karti hai.