पावर ब्लॉक के कारण यात्रियों को हुई परेशानीOn Sunday, February 12th, 2024, a 13-hour and 10-minute power and traffic block was implemented on the Asansol Railway Division between Madankatta-Joramow (Bridge No. 603) and Lahaban-Simutla (Bridge No. 676) for bridge maintenance. This caused major disruptions to train services between Howrah and Patna, with 11 local trains and the 22197...
more... 'Pratham Swatantrata Sangram Super Express' cancelled. Four trains, including the Vande Bharat Express and the Purva Superfast Express, were operated on a single line. Other trains had their routes modified, with some terminated at Jhajha. The route modification affected trains like Kolkata-Amritsar Akal Takht Express, Patna-Dhanbad Intercity, Raxaul-Hyderabad Express, and Patna-Puri Express. The block was necessary to allow for the replacement of girders on the railway bridge over the Jayanti River between Madankatta and Joramow. The railway administration expressed regret for the inconvenience caused to passengers.
Sunday, February 12th, 2024 ko Asansol Rail Mandal ke Madankatta-Joramow (Bridge No. 603) aur Lahaban-Simutla (Bridge No. 676) ke beech mein 13 ghante 10 minute ka power aur traffic block tha. Isse Howrah aur Patna ke beech train services mein bahut problem hui. 11 local trains aur 22197 'Pratham Swatantrata...
more... Sangram Super Express' cancel ho gayi. Vande Bharat Express aur Purva Superfast Express jaisi 4 trains ko single line pe operate kiya gaya. Dusri trains ka route change kiya gaya, aur kuchh trains ko Jhajha pe terminate kiya gaya. Route changes ne Kolkata-Amritsar Akal Takht Express, Patna-Dhanbad Intercity, Raxaul-Hyderabad Express, aur Patna-Puri Express jaisi trains ko affect kiya. Block Jayanti River ke upar Madankatta aur Joramow ke beech railway bridge pe girders badalne ke liye tha. Rail administration ne passengers ko hone wali inconvenience ke liye maf karna chaha.