Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Oct 5 02:10:56 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6209485
Posted: Yesterday (20:02)

No Responses Yet
Rail News
4738 views
0

Metro
UPMRCL/Kanpur Metro
Yesterday (20:02)   Kanpur Metro Completes Track, Third Rail, and Signaling on Corridor-1's Downline

Exynos9611~   20786 news posts
Entry# 6209485         Tags   Past Edits
Kanpur: ‘डाउनलाइन‘ पर नयागंज स्टेशन तक हुआ मेट्रो ट्रेन का ट्रायल, सिग्नलिंग, ट्रैक व पावर सप्लाई का भी हुआ परीक्षण

Kanpur Metro conducted a test run of a metro train on the 'downline' of the Chunni Ganj-Nayaganj underground section of Corridor-1 (IIT-Nauabasta) on October 4th, 2024. This marks the completion of the track, third rail system, and signaling for both the 'up-line' and 'downline' between IIT and Nayaganj, a total of...
more...
15 kilometers. The third rail, which powers the trains, was charged for the first time on this date and will be operational 24/7. This test run was conducted to evaluate the train's performance and ensure the smooth functioning of various systems, including signaling, track, and power supply. During the test run, the Automatic Train Protection (ATP) mode was activated to test these interfaces. Additionally, software location tests for signaling equipment were conducted to verify their accuracy. The test also involved running the train at various speeds to evaluate its performance. Upgraded software will be implemented based on the results of this test. Uttar Pradesh Metro Rail Corporation (UPMRC) Managing Director Sushil Kumar congratulated all employees and residents for the progress made in the construction of Kanpur Metro. He highlighted the significant achievements and the teamwork involved in completing the installation of systems at the Nayaganj underground station. Finishing work at these stations will be completed soon. Currently, passenger services on the 9 km long priority corridor (IIT-Motijheel) are operational within the 24 km long Corridor-1 (IIT-Nauabasta). Construction of the Chunni Ganj-Nayaganj and Kanpur Central-Transport Nagar underground sections and the 5 km long Baradevi-Nauabasta elevated section is progressing rapidly. The construction of both sections of the 8.60 km long Corridor-2 (CSA-Barra 8) is also ongoing.

Kanpur Metro ne 4 October 2024 ko Corridor-1 (IIT-Nauabasta) ke Chunni Ganj-Nayaganj underground section ke 'downline' mein metro train ka test run kiya. Isse IIT aur Nayaganj ke beech, lagabhag 15 kilometer lamba metro route ke dono hi line ('up-line' aur 'downline') par track, third rail system aur signaling puri tarah...
more...
se taiyaar ho gaya hai. Is din third rail ko pehli baar charge kiya gaya aur yeh 24/7 chalu rahega. Yeh test run train ke performance ko check karne aur signaling, track aur power supply jaise systems ke sahi se kaam karne ki jaanch karne ke liye kiya gaya. Test run mein Automatic Train Protection (ATP) mode activate kiya gaya aur signaling equipment ke software location test bhi kiye gaye. Train ko alag-alag speed par run karke uski performance ki jaanch bhi ki gayi. Is test ke results ke base par software ko upgrade kiya jaayega. Uttar Pradesh Metro Rail Corporation (UPMRC) ke Managing Director Sushil Kumar ne sabhi employees aur citywalon ko is progress ke liye badhai di. Unhone Nayaganj underground station par system installation ko pura karne ke liye kiye gaye teamwork aur achievements ko highlight kiya. In stations par finishing ka kaam jaldi hi pura ho jaayega. Currently, 24 km long Corridor-1 (IIT-Nauabasta) ke andar 9 km long priority corridor (IIT-Motijheel) par passenger services chal rahi hai. Chunni Ganj-Nayaganj aur Kanpur Central-Transport Nagar underground sections aur 5 km long Baradevi-Nauabasta elevated section ka construction jaldi ho raha hai. 8.60 km long Corridor-2 (CSA-Barra 8) ke dono sections ka construction bhi jari hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

4312546 ★★★ 285jishnuthakur12301^...
4566740 ★★★ 135SCoR~
1867072 ★★★ 144AmravatiSuperfast~
6177596 ★★★ 30KeepTravelling^~
2477978 ★★★ 56purubaba.ankit~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy