जुगसलाई में ओवरलोड वाहन से क्षतिग्रस्त हो रहा रेलवे अंडरब्रिजThe Jugsalai railway underbridge's roof and walls are being damaged by overloaded vehicles. This is causing problems with train operations and increasing the risk of accidents. The railway engineering department is carrying out repairs. To ensure safe train operations, the railway department conducts safety audits of subways, bridges, and other structures....
more... Repairs have been underway since Thursday, with one side of the underbridge closed to traffic. The damage is believed to be caused by the lack of overload checks on the road. The other side of the underbridge, built as part of the third line project, has a higher height and is not facing the same risks.
Jugsalai ka railway underbridge ke chhat aur diwar overloaded vehicles ke wajah se kharab ho rahe hain. Isse Tata Nagar railway operation aur engineering department ko pareshani badh gayi hai. Diwar aur chhat mein cracks aane se trains ke chalne par asar pad raha hai aur haadsa hone ka bhi dar...
more... hai. Safety ke liye railway engineering department time-time par underbridge ki repair karata hai. Thursday se underbridge ke ek side se vehicles ka aana-jana band kar diya gaya hai aur repair ka kaam chal raha hai. Bataaya ja raha hai ki safe train operation plan ke tahat railway subway, bridge aur other constructions ki safety audit karta hai. Pehle Aditya Pur mein Kharkai river bridge pe line block kar ke kai dinon tak repair ka kaam chala tha. Jaanकारी aise hai ki road pe overloaded check ki system nahi hone se Jugsalai underbridge ke chhat mein darar aayi thi. Third line project se banaya gaya dusra side ka underbridge zyada upar hai isliye yeh khatra nahi hai.