Indore Metro: इंदौर सुपर कॉरिडोर में पहली बार 90 की स्पीड में दौड़ी मेट्रो ट्रेन, अब ब्रेकिंग व इलेक्ट्रिसिटी कैमरा की टेस्टिंगIndore Metro's second trial run was conducted on Tuesday night. The train reached a speed of 90 km/h on the Super Corridor, covering the 5.9 km distance between Gandhi Nagar Station and TCS Chowk in just 3 minutes. This was a significant milestone, as the train had previously been tested at...
more... speeds ranging from 10 to 25 km/h. The trial run was conducted at the design speed of 90 km/h, although the operational speed for passengers will be 80 km/h. The testing involved running the metro train on the Super Corridor for 3-4 times at 90 km/h. The trial was conducted using a single coach, but a 5-coach set will be used for further testing. The Indore Metro management has planned a commercial run on the Priority Corridor by December. The trial also included testing of the braking system, electrical systems, and cameras. The train's performance at 80 km/h will be evaluated by applying the brakes suddenly. The civil structure, signaling systems, and third rail tracks were also tested. Further testing of the software with the 5-coach set is planned, along with other parameters.
Indore Metro ka dusra trial run Mangalwar ki raat ko hua. Train Super Corridor pe 90 km/h ki speed pe daudi, Gandhi Nagar Station se TCS Chowk tak 5.9 km ka safar sirf 3 minute me poora kiya. Yeh ek bada milestone tha, kyuki train pehle 10 se 25 km/h ki...
more... speed pe test ki gayi thi. Trial run train ki design speed 90 km/h pe kiya gaya, halanki passengers ke liye operational speed 80 km/h hogi. Testing me Super Corridor pe metro train ko 3-4 baar 90 km/h ki speed pe chalaaya gaya. Trial ek single coach ke saath kiya gaya, lekin aage 5-coach set ke saath further testing hogi. Indore Metro management ne December tak Priority Corridor pe commercial run ki plan banaayi hai. Trial me braking system, electrical systems, aur cameras ki bhi testing hui. Train ki performance 80 km/h pe achanak brake lagaake check ki jaayegi. Civil structure, signaling systems, aur third rail tracks ki bhi testing hui. 5-coach set ke saath software ki testing aage ki jaayegi, aur dusre parameters bhi check kiye jaayenge.