Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF/TrainSet:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Wed Oct 16 19:44:35 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

18190/Ernakulam Jn. - Tatanagar Express (PT)
एरणाकुलम जंक्शन - टाटानगर एक्सप्रेस

TCR/Thrissur (Trichur) --> SCMN/Simhachalam North

Latest News
(You need to double-check/verify this info yourself)
JCO 11.10.24 is diverted via MLPM - AJJ - RU
Sat Oct 12, 2024 (01:10AM)
News History
▪️ Departure from Ernakulam on 03.10.24, 05.10.24 & 07.10.24 will be diverted via Podanur - Coimbatore - Irugur, with stoppage at Coimbatore
Mon Sep 30, 2024 (09:18PM)
▪️ Departure from Ernakulam on 05.09.24 is cancelled
Mon Sep 02, 2024 (07:23PM)
JCO 08.08.24 and 10.08.24 Will Be Diverted to Run Via Podanur and Irugur skipping Stoppage at Coimbatore.
Fri Aug 02, 2024 (06:46AM)
Train No. 18190 Ernakulam – Tatanagar Express leaving Ernakulam at 07.15 hrs on 04th August, 2024 will run as per normal schedule. Earlier notified cancellation withdrawn.
Wed Jul 31, 2024 (07:07PM)
▪️ Departure from Ernakulam on 01.08.24 is cancelled ▪️Train No. 18190 Ernakulam – Tatanagar Express leaving Ernakulam at 30th July, 2024 will be diverted to run via Podanur, Coimbatore and Irugur
Wed Jul 31, 2024 (01:43PM)
Train No. 18190 Ernakulam – Tatanagar Express leaving Ernakulam at 30th July, 2024 will be diverted to run via Podanur, Coimbatore and Irugur and will be Short-terminated at Chakradharpur due to Derailment of Howrah - Mumbai Mail.
Tue Jul 30, 2024 (10:24PM)
▪️ Departure from 29.07.24 will be diverted via Rourkela - Muri - Chandil - Tatanagar ▪️ Departure from Ernakulam on 28.07.24 has been short terminated at Chakradharpur ▪️Train No. 18190 Ernakulam – Tatanagar Express leaving Ernakulam at 30th July, 2024 will be diverted to run via Podanur, Coimbatore and Irugur
Tue Jul
...
more...
30, 2024 (05:38PM)
▪️ Departure from Ernakulam on 28.07.24 has been short terminated at Chakradharpur ▪️Train No. 18190 Ernakulam – Tatanagar Express leaving Ernakulam at 30th July, 2024 will be diverted to run via Podanur, Coimbatore and Irugur
Tue Jul 30, 2024 (09:45AM)
Train No. 18190 Ernakulam – Tatanagar Express leaving Ernakulam at 07.15 hrs o­n 04th , 06th , 09th ,11th ,13th ,16th ,18th , 20th , 23rd , 25th, 27th & 30th July, 2024 will be diverted to run via Podanur, Coimbatore and Irugur.
Sat Jul 06, 2024 (11:26AM)
▪️ Departure from Ernakulam from 06.06.24 - 12.06.24 is diverted via Vizianagaram - Bhubaneswar - Jakhpura - Chaibasa - Rajkharswan
Fri Jun 07, 2024 (10:19AM)
Train No. 18190 Ernakulam – Tatanagar Express leaving Ernakulam at 07.15 hrs o­n 07th, 09th & 13th May, 2024 will be diverted to run via Coimbatore and regulated for 60 mins enroute
Tue May 07, 2024 (02:12PM)
▪️ Departure from Ernakulam from 15.04.24 - 23.04.24 is diverted via Vizianagaram - Bhubaneswar - Jakhapura - Rajkharswan
Wed Apr 10, 2024 (03:12PM)
18190 Ernakulam-Tatanagar Express journey commencing w.e.f 10.03.2024 will now run daily from Ernakulam.
Wed Mar 06, 2024 (11:13AM)
▪️ Departure from Ernakulam on 28.02.2024 & 03.03.2024 will be diverted to run via Vizianagaram, Palasa and Jaroli skipping stoppages at Bobbili, Parvatipuram, Rayagada, Muniguda, Ambodala, Kesinga, Titlagarh, Balangir, Bargarh Road, Sambalpur, Jharsuguda, Rajgangpur, Rourkela, Jaraikela, Goilkera and Chakradharpur. ▪️ To Run on Daily Basis W.E.F 10.03.24. Ex. ERS ▪️ Revised...
more...
Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II Tier - 3 = Total 22 LHB Coaches W.E.F 10.03.2024. Ex. ERS
Wed Feb 28, 2024 (11:10PM)
▪️ Departure from Ernakulam on 28.02.2024 & 03.03.2024 will be diverted to run via Vizianagaram, Palasa and Jaroli skipping stoppages at Bobbili, Parvatipuram, Rayagada, Muniguda, Ambodala, Kesinga, Titlagarh, Balangir, Bargarh Road, Sambalpur, Jharsuguda, Rajgangpur, Rourkela, Jaraikela, Goilkera and Chakradharpur.
Sun Feb 25, 2024 (12:59AM)
▪️ Departure from Ernakulam from 21.01.24 - 24.01.24 is diverted via Vizianagaram - Bhubaneswar - Jaroli - Rajkharswan ▪️Revised Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II...
more...
Tier - 3 = Total 22 LHB Coaches WEF 10/03/2024. Ex. ERS
Mon Jan 15, 2024 (09:27PM)
Revised Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II Tier - 3 = Total 22 LHB Coaches WEF 10/03/2024. Ex. ERS
Fri Dec 29, 2023 (07:36PM)
▪️ To Run 5 Days a Week W.E.F 04.01.24. Ex. ERS▪️ Revised Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II Tier - 3 = Total 22 LHB...
more...
Coaches WEF 10/03/2024. Ex. ERS
Wed Dec 20, 2023 (08:31PM)
▪️ Cancelled on 05.12.23▪️ Revised Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II Tier - 3 = Total 22 LHB Coaches WEF 10/03/2024. Ex. ERS
Sat Dec 02,
...
more...
2023 (05:43PM)
▪️ Revised Coach Composition: EOG - 1, LSLRD - 1, GS - 2, PC - 1, Sleeper Class - 4, AC III Tier Economy - 3, AC III Tier - 7 & AC II Tier - 3 = Total 22 LHB Coaches WEF 10/03/2024. Ex. ERS.
Mon Nov 20, 2023 (11:27AM)
▪️ Rescheduled to leave Ernakulam at 03.00 hrs on 02.11.23 instead of 07.15 hrs on 01.11.23
Wed Nov 01, 2023 (02:13PM)
▪️ Departure from Ernakulam on 11.10.23 will be diverted via Vizianagaram - Cuttack - Jakhapura - Nayagarh - Jaroli - Dongaoposi - Rajkharswan
Thu Sep 28, 2023 (09:44AM)
Will stop at Mahadevsal station for 2 minutes on every Tuesday from 8 July 2023 to 31 August 2023 (Shravani Mela Period).
Sat Jul 08, 2023 (01:39PM)
🔹 Train no. 18190/Ernakulam - Tatanagar Express (PT) JCO 16/05/2023 to 31/05/2023 will be regulated at a convenient location for 50 minutes.
Tue May 16, 2023 (07:59AM)
🔹 Train no. 18190/Ernakulam - Tatanagar Express (PT) leaving Ernakulam Jn at 07.15 hrs o­n 03rd May, 2023 is fully cancelled.
Tue May 02, 2023 (12:22PM)
Train No. 18190 Ernakulam – Tatanagar Express scheduled to leave Ernakulam Jn at 07.15 hrs o­n 05th March, 2023 will be rescheduled to leave Ernakulam Jn at 10.45 hrs (Late by 3 hours 30 mins)
Thu Mar 02, 2023 (03:36PM)
▪️ Departure from Ernakulam on 25.09.22 & 28.09.22 is cancelled
Tue Sep 20, 2022 (05:05PM)
Due to Non-Interlocking works for commissioning of double line between Titlagarh - Sikir and 3rd line between Titlagarh - Kesinga in Sambalpur Division of East Coast Railway, train num 18190 from Ernakulam to Tatanagar will be diverted via Vizianagaram, Khurda Rd, Cuttack, Nayagarh, Jaroli on journey commencing on 06.07.2022, 10.07.2022, 13.07.2022...
more...
& 17.07.2022.
Mon Jun 27, 2022 (08:22PM)
Restoration of Unreserved Booking in this Train will start W.E.F 03/07/2022
Tue Jun 21, 2022 (08:34PM)
▪️2nd Rake has DL1 in the front. ▪️2nd Rake running with BE1 instead of SE1▪️Coach Composition to Revise WEF 19.06.2022. New Coach Composition WEF 19.06.2022 Ex - ERS EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD – 1 & PC...
more...
– 1. Total = 22 Coaches
Mon Mar 28, 2022 (06:56PM)
▪️Coach Composition to Revise WEF 19.06.2022. New Coach Composition WEF 19.06.2022 Ex - ERS EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD – 1 & PC – 1. Total = 22 Coaches
Mon Mar 28, 2022 (06:32PM)
▪️ICF CC -- L DL2 D2 A1 B5 -- B1 SE1 S11 PC S10 -- S1 D1 DL1. ▪️Coach Composition to Revise WEF 19.06.2022. New Coach Composition WEF 19.06.2022 Ex - ERS EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD...
more...
– 1 & PC – 1. Total = 22 Coaches
Tue Mar 15, 2022 (10:50PM)
This Train Diverted Via EE, TDD on 02-03-2022 from Ernakulam Because Of Ni Works On New Double Line from Aravalli To BhimavaramTown 📢⚟ To Run with LHB Rake WEF 06.03.2022 Ex - ERS. Coach Composition ; EOG – 1, 2S – 2, SL – 11, 2A – 1, 3A – 4,...
more...
LSLRD – 1 & PC – 1. Total = 21 Coaches. Coach Composition to Revise WEF 19.06.2022. New Coach Composition WEF 19.06.2022 Ex - ERS EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD – 1 & PC – 1. Total = 22 Coaches
Wed Feb 23, 2022 (10:26AM)
📢⚟ To Run with LHB Rake WEF 06.03.2022 Ex - ERS. Coach Composition ; EOG – 1, 2S – 2, SL – 11, 2A – 1, 3A – 4, LSLRD – 1 & PC – 1. Total = 21 Coaches. Coach Composition to Revise WEF 19.06.2022. New Coach Composition WEF 19.06.2022...
more...
Ex - ERS EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD – 1 & PC – 1. Total = 22 Coaches
Wed Feb 23, 2022 (08:40AM)
📢⚟ To Run with LHB Rake WEF 27.03.2022 Ex - ERS. Coach Composition ; EOG – 1, 2S – 2, SL – 11, 2A – 1, 3A – 4, LSLRD – 1 & PC – 1. Total = 21 Coaches. Coach Composition to Revise WEF 19.06.2022. New Coach Composition WEF 19.06.2022...
more...
Ex - ERS EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLRD – 1 & PC – 1. Total = 22 Coaches
Mon Feb 07, 2022 (08:24PM)
📢⚟ To Run with LHB Rake WEF 27.03.2022 Ex - ERS. Coach Composition : EOG – 1, 2S – 2, SL – 11, 2A – 1, 3A – 4, LSLR – 1 & PC – 1. Total = 21 Coaches. Coach Composition to Revise WEF 19.06.2022. New Coach Composition WEF 19.06.2022...
more...
Ex - ERS EOG – 1, 2S – 2, SL – 7, 2A – 2, 3A – 5, 3E – 3, LSLR – 1 & PC – 1. Total = 22 Coaches
Sun Feb 06, 2022 (08:23AM)
JCO 08 and 12 December 2021 cancelled
Fri Dec 03, 2021 (07:46PM)
2 Sleeper coaches will be added temporarily on 28.11.2021
Wed Nov 24, 2021 (02:23PM)
0 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Thu Oct 01, 1970
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is available at TCR, TUP, ED, SA, JTJ, KPD, GDR,...
more...
RJY, VZM, RGDA, TIG & SBP.
Updated: Aug 26 (11:23) by _V_K_^~
Dep:
Arr:
RSA - Rake Sharing
☆ 6 Dedicated Rakes ☆ PM @TATA ☆ SM @ERS ☆
Rating: 2.7/5 (48 votes)
cleanliness - average (8)
punctuality - good (8)
food - average (8)
ticket avbl - average (8)
u/r coach - poor (4)
railfanning - average (8)
safety - average (8)
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 A3
  3
 A2
  4
 A1
  5
 B7
  6
 B6
  7
 B5
  8
 B4
  9
 B3
 10
 B2
 11
 B1
 12
 M3
 13
 M2
 14
 M1
 15
 PC
 16
 S4
 17
 S3
 18
 S2
 19
 S1
 20
 GS
 21
 GS
 22
SLR
▪️4 Rakes mentioned above. ▪️2 Rakes have a different CC -- LOCO SLR GS GS S4 S3 S2 S1 PC M3 M2 M1 B7 B6 B5 B4 B3 B2 B1 A3 A2 A1 EOG
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train News

Page#    100 News Items  next>>
Today (11:36) Elephant Calf Killed, Two Injured in Train Accident in Jharkhand
Entry# 6220614   
  Past Edits
Oct 16 2024 (11:37)
Station Tag: Bondamunda A Cabin/XX-BOND added by AdittyaaSharma^~/1421836

Oct 16 2024 (11:37)
Station Tag: Chakradharpur/CKP added by AdittyaaSharma^~/1421836
झारखंड में 23 हाथियों का झुंड पार कर रहा था रेल लाइन, तभी आ गई ट्रेन; एक की दर्दनाक मौत

On Monday night near Bundamunda in the Chakradharpur Railway Division of Jharkhand, an eight-month-old elephant was killed after being hit by a goods train. Two other elephants, one a calf and one an adult, were injured. The incident occurred at around 9.44 PM near A Cabin on the up line, causing...
more...
a disruption in train services. Train operations resumed after five hours, around 2.15 AM, after railway personnel removed the carcass from the track. Several trains, including the Samaleshwari Express, were stranded during this time. The incident occurred when a herd of 23 elephants was crossing the railway line near Bundamunda A Cabin on the Howrah-Mumbai main route. A goods train was standing on the other track, and when the N Box goods train came from the up main line, the elephants panicked and ran. The eight-month-old calf was hit by the train, resulting in its death. Two other elephants, including a calf, were injured. On Tuesday morning, forest department officials, including DFO Yashwant Sethi, reached the scene of the accident. The carcass was buried after a post-mortem examination. The train's assistant driver, Kavi Raj Mahto, was taken into custody for questioning about the train's speed and the incident. However, he was released around 3:30 PM after questioning. The N Box goods train was being operated by driver Manoj Kumar and assistant driver Kavi Raj Mahto. The news of the assistant driver's detention led to protests by the crew at the Bundamunda Crew Lobby, where they staged a sit-in demonstration.

Jharkhand ke Chakradharpur Rail Mandal ke Bundamunda mein, ek maalgaadi ke chapet mein aakar, aath mahine ka nanha haathi mar gaya. Wahi, ek nanha aur ek vaysk sahit, do haathi ghayal ho gaye. Somvaar raat lagbhag 9.44 baje A Cabin ke paas up line par yeh ghatna hui, jiske baad trains...
more...
ka chalna band ho gaya. Raat karib 1 baje rail karmiyon dwara track se shav ko hataane ke baad, karib 2.15 baje paanch ghante baad up line par trains ka chalna bahaal hua. Is dauraan Samaleshwari Express sahit kai trains jahaan-tahaan khadi raheen. Yeh ghatna tab hui jab 23 haathiyon ka jhund Howrah-Mumbai mukhya marg par Bundamunda A Cabin ke paas rail line paar kar raha tha. Ek maalgaadi dusri line par khadi thi aur jab N Box naam ki maalgaadi up main line se aayi, toh haathi idhar-udhar bhaagne lage aur aath mahine ka nanha haathi maalgaadi ki chapet mein aa gaya. Is haadse mein nanhe haathi ki maut ho gayi aur do aur haathi, jisme ek nanha haathi bhi shamil hai, ghayal ho gaye. Mangalvaar subah, ghatna ki jaankaari milte hi, van vibhag ke adhikari, jisme DFO Yashwant Sethi bhi shamil hain, ghatna sthal par pahunche. Shav ko postmortem ke baad dafan diya gaya. Train ke sahayak chalak, Kavi Raj Mahto, ko ghatna ke samay train ki speed aur ghatna ki jaankaari lene ke liye giraftar kiya gaya. Halanki, unhe dopahar karib 3:30 baje poochhtaach ke baad riha kar diya gaya. N Box naam ki maalgaadi ko chalak Manoj Kumar aur sahayak chalak Kavi Raj Mahto chala rahe the. Sahayak chalak Kavi Raj Mahto ko van vibhag dwara giraftar kiye jaane ki khabar Bundamunda Crew Lobby pahunchte hi, chalak bhadak gaye aur Bundamunda Crew Lobby mein maujood train chalak aur sahayak chalakoon ne dharna pradarshan shuru kar diya.
Today (07:33) Elephant Killed, Two Injured in Train Collision in Chakradharpur
Entry# 6220478   
  Past Edits
Oct 16 2024 (07:33)
Station Tag: Tatanagar Junction/TATA added by AdittyaaSharma^~/1421836

Oct 16 2024 (07:33)
Station Tag: Rourkela Junction/ROU added by AdittyaaSharma^~/1421836

Oct 16 2024 (07:33)
Station Tag: Chakradharpur/CKP added by AdittyaaSharma^~/1421836

Oct 16 2024 (07:33)
Station Tag: Bondamunda A Cabin/XX-BOND added by AdittyaaSharma^~/1421836
बंडामुंडा : मालगाड़ी की चपेट में आकर आठ माह के नन्हे हाथी की मौत, दो घायल

A young elephant, eight months old, was killed when it was hit by a goods train in the Bandamunda area of Chakradharpur Rail Division. Two other elephants, including a young one, were injured in the incident. The accident occurred around 9:44 PM on Monday, halting train operations for five hours. The...
more...
train driver's assistant was briefly detained by the forest department but later released after questioning. The incident happened as a herd of 23 elephants was crossing the railway track, and one of them got hit by a goods train called 'N Box'. The forest department sent the injured elephants to a safe location in the Sagwan forest for treatment. Several trains were delayed due to the train stoppage, including the Samaleswari Express. The forest department had informed the railway authorities about the elephants in the area for the past three-four days, but no concrete steps were taken, according to the Divisional Forest Officer (DFO). The Senior Divisional Commercial Manager (Sr. DCM) stated that several measures have been taken to prevent elephants from entering the railway tracks, including iron barricading and speed control in elephant zones.

Chakradharpur Rail Division ke Bandamunda mein ek maalgaadi ke chapet mein aakar aath mahine ka nanha hathi mar gaya. Is haadse mein ek nanha aur ek vayask hathi bhi ghayal ho gaye. Yeh ghatna Monday raat 9:44 PM ke aas-paas hui, jisse train ka chalana panch ghanta ke liye ruk gaya....
more...
Forest department ne train driver ke assistant ko thodi der ke liye hissat mein liya, lekin baad mein sawal-jawab ke baad chhod diya. Yeh ghatna tab hui jab 23 hathiyon ka jhund railway track paar kar raha tha, aur unme se ek 'N Box' naam ke maalgaadi ke chapet mein aaya. Forest department ne ghayal hathiyon ko Sagwan jungle mein ilaaj ke liye safe location par bheja. Train rukne ki wajah se kai trains der se chali, jaise ki Samaleswari Express. Forest department ne railway authorities ko is area mein hathiyon ke baare mein pehle se hi bata diya tha, lekin DFO ke mutabik, koi bhi concrete kadam nahi uthaye gaye. Senior Divisional Commercial Manager (Sr. DCM) ne kaha ki hathiyon ko railway track par aane se rokne ke liye kai measures liye gaye hain, jaise ki iron barricading aur elephant zones mein speed control.
बंडामुंडा में शिशु हाथी की मौत की घटना में कई ट्रेनें हुई बाधित

A baby elephant from a herd of 23 elephants was killed by a train near Bandamunda A Cabin in Chakradharpur. The incident disrupted train services in the Chakradharpur Railway Division for approximately three hours. Several trains, including the 18006 Down Koraput Howrah Samaleswari Express, 22905 Okha Howrah Express, 18190 Ernakulam Tatanagar...
more...
Express, 18114 Bilaspur Tatanagar Express, 12811 Mumbai Lokmanya Tilak Hatia Express, 13352 Alleppey Dhanbad Express, 02896 Puri Shalimar Weekly Superfast Express, 02831 Dhanbad to Bhubaneswar Express, 18030 Shalimar to Mumbai Express, 18113 Tatanagar Bilaspur, 08149 Hatia Rourkela Passenger, 12810 Howrah Mumbai Mail, and 18102 Gyaneshwari Express Jammu Tawi Tatanagar Express were delayed for a considerable time due to the incident.

Chakradharpur mein Bandamunda A Cabin ke paas, 23 hathiyon ke jhund mein, ek shishu hathi train ke chapet mein aakar mar gaya. Is ghatna ke karan, Chakradharpur Rail Mandal mein, lagbhag teen ghante tak train sevaen badhit rahin. Kai trainon, jaise 18006 Down Koraput Howrah Samaleswari Express, 22905 Okha Howrah Express,...
more...
18190 Ernakulam Tatanagar Express, 18114 Bilaspur Tatanagar Express, 12811 Mumbai Lokmanya Tilak Hatia Express, 13352 Alleppey Dhanbad Express, 02896 Puri Shalimar Weekly Superfast Express, 02831 Dhanbad se Bhubaneswar Express, 18030 Shalimar se Mumbai jaane wali Express, 18113 Tatanagar Bilaspur, 08149 Hatia Rourkela Passenger, 12810 Howrah Mumbai Mail, aur 18102 Gyaneshwari Express Jammu Tawi Tatanagar Express, ka chalana kaafi der tak badhit hua.
Two express trains from Kerala rescheduled on 8.10.2024; check details

Due to bridge renovations between Mannanur and Ottappalam in the Palakkad division, two express trains from Kerala have been rescheduled. Train No 13352 Alappuzha – Dhanbad Express, originally scheduled to depart Alappuzha at 6 am on October 8th, will now leave at 8:45 am (a delay of 2 hours and 45...
more...
minutes). Train No 18190 Ernakulam Junction – Tatanagar Express, originally scheduled to depart Ernakulam at 7:15 am on October 8th, will now leave at 9:30 am (a delay of 2 hours and 15 minutes).

Palakkad division mein Mannanur aur Ottappalam ke beech bridge ke renovation ke kaaran, Kerala se chalne wala do express trains reschedule kiya gaya hai. Train No 13352 Alappuzha – Dhanbad Express, jo originally 8 October ko subah 6 baje Alappuzha se chalta tha, ab 8:45 baje chalta hai (2 hours aur...
more...
45 minutes ki delay ke saath). Train No 18190 Ernakulam Junction – Tatanagar Express, jo originally 8 October ko subah 7:15 baje Ernakulam se chalta tha, ab 9:30 baje chalta hai (2 hours aur 15 minutes ki delay ke saath).
Southern Railway announces train cancellations, diversions: Full list

Southern Railways has announced changes to train services in the Salem Division for October 2024. These changes include cancellations, diversions, short terminations, and origination changes for various trains. The changes were announced following the approval of Fixed Time Corridor blocks for asset maintenance. Four trains will be fully cancelled: Train...
more...
No. 06816 (Podanur – Mettupalayam MEMU) on October 24th and 27th, and Train No. 06817 (Mettupalayam – Coimbatore MEMU) and Train No. 06815 (Mettupalayam – Podanur MEMU) on October 24th and 27th respectively. Train No. 18190 (Ernakulam – Tatanagar Express) will be diverted via Podanur, Coimbatore, and Irugur on October 3rd, 5th, and 7th, with an additional stop at Coimbatore. Three trains will be short terminated: Train No. 06810 (Erode – Tiruchchirappalli Passenger) at Karur on October 1st, Train No. 06611 (Tiruchchirappalli – Erode Passenger) at Virarakkiyam on October 1st, 5th, and 6th, and Train No. 16846 (Sengottai – Erode Express) at Karur on October 5th and 6th. Finally, Train No. 16843 (Tiruchchirappalli – Palakkad Town Express), originally scheduled to depart from Tiruchchirappalli on October 1st, will now originate from Karur at 14:25 hrs.

Southern Railways ne October 2024 ke liye Salem Division mein train services mein kuchh changes announce kiye hain. Isme full cancellations, diversions, short terminations, aur kuchh trains ke origination mein badlaav shamil hain. Yeh changes asset maintenance ke liye Fixed Time Corridor blocks ke approval ke baad announce kiye...
more...
gaye hain. Four trains fully cancel ho gaye hain: Train No. 06816 (Podanur – Mettupalayam MEMU) 24th aur 27th October ko, aur Train No. 06817 (Mettupalayam – Coimbatore MEMU) aur Train No. 06815 (Mettupalayam – Podanur MEMU) 24th aur 27th October ko. Train No. 18190 (Ernakulam – Tatanagar Express) ko 3rd, 5th, aur 7th October ko Podanur, Coimbatore, aur Irugur se divert kiya jaayega, aur Coimbatore mein ek additional stop bhi diya jaayega. Three trains short terminated ki gaye hain: Train No. 06810 (Erode – Tiruchchirappalli Passenger) 1st October ko Karur mein, Train No. 06611 (Tiruchchirappalli – Erode Passenger) 1st, 5th, aur 6th October ko Virarakkiyam mein, aur Train No. 16846 (Sengottai – Erode Express) 5th aur 6th October ko Karur mein. Finally, Train No. 16843 (Tiruchchirappalli – Palakkad Town Express), jo originally 1st October ko Tiruchchirappalli se depart karna tha, ab Karur se 14:25 hrs pe originate karega.
Page#    100 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy