Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Oct 7 20:42:52 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Filters:

Page#    26 Blog Entries  <<prev  next>>
1 Followers
Info Update
26334 views
10

Aug 24 2020 (02:33)   VSKP/Visakhapatnam Junction (8 PFs)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Entry# 4694428            Tags  
The atlas shows a connection between Visakhapatnam station and Visakhapatnam port.

As far as I remember, VSKP station never had a connection to the port. The line going to the port branches off at Gopalapatnam and trains go through the Waltair marshalling yard till the Reception and Dispatch yard of the port (parallel to VSKP station), where the port trust's locomotives takeover.
...
more...

From VSKP the line continues till the old Vizagapatnam town station (VZT) and terminates there.

Unless a some connection has been made in recent years, this section of the map has to be changed.

RBS too doesn't show a direct path between VSKP and the port. The shortest path reported by RBS for goods traffic goes from VSKP to VZP through SCMN (reversal at SCMN to go through the marshalling yard lines).

Translate to English
Translate to Hindi

1 Public Posts - Mon Aug 24, 2020

15742 views
0

Sep 07 2020 (03:47)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 4694428-2              
#AtlasMonitors #moderator

Please take the necessary action for this. The map currently being displayed is incorrect.
Translate to English
Translate to Hindi

1 Public Posts - Mon Sep 07, 2020
Info Update
16615 views
11

Aug 20 2019 (19:49)   KJN/Kannauj (2 PFs) | MGS/WAP-4/22997
12611_MAS_GARIB^~
12611_MAS_GARIB^~   15202 blog posts
Entry# 4406128            Tags   Past Edits
कन्नौज 20 अगस्त, 2019ः रेल संरक्षा आयुक्त, दक्षिण पूर्व, पूर्वोत्तर एवं पूर्व परिमंडल श्री अभय कुमार राय ने मंडल रेल प्रबंधक श्री दिनेश कुमार सिंह के साथ 20 अगस्त, 2019 को इज्जतनगर मंडल के कन्नौज-कल्याणपुर रेल खंड के विद्युतीकरण के पश्चात् विशेष निरीक्षण टेªन द्वारा गहन निरीक्षण किया। इसके पश्चात् श्री राय ने कल्याणपुर-कन्नौज तक गति परीक्षण भी की। निरीक्षण स्पेशल कल्याणपुर से 4.20 बजे चलकर लगभग 68 किमी की दूरी 40 मिनट में तयकर कन्नौज पहुंची। इस दौरान सीआरएस गाड़ी की गति 120 किलोमीटर प्रति घंटा की गति से दौड़ाया गया।
विदित हो कि रेल संरक्षा आयुक्त द्वारा 29 मार्च, 2019 को मथुरा जं. से मेण्डू 48 किमी; 14 मई, 2019 को मेंडू से दरियावगंज 108 किमी एवं दरियावगंज से फर्रुखाबाद
...
more...
56 किमी रेल खंडों का निरीक्षण किया जा चुका है।
ज्ञात हो कि मथुरा-कासगंज-कल्याणपुर रेल खंड 338 किमी के विद्युतीकरण का कार्य की स्वीकृति वर्ष-2016-17 के बजट में रु. 432.99 करोड़ की अनुमानित लागत से प्राप्त हुई थी। इस कार्य को सम्पादन के लिए मैसर्स इरकाॅन इन्टरनेशनल लिमिटेड को सौपा गया।
निरीक्षण के दौरान पूर्वोत्तर रेलवे, मुख्यालय गोरखपुर से प्रमुख मुख्य विद्युत इंजीनियर श्री बेचू राय, मुख्य सिगनल इंजीनियर श्री एस.एन. साह, मुख्य महाप्रबंधक (इरकाॅन) श्री आशुतोष पंत तथा इज्जतनगर मंडल से वरिष्ठ मंडल इंजीनियर (समन्वय) श्री आशुतोष कुमार मिश्रा, वरिष्ठ मंडल इंजीनियर-।। श्री ए.के. सिंह, वरिष्ठ मंडल सिगनल एवं दूरसंचार इंजीनियर श्री जी.पी.एस. नारायण, वरिष्ठ मंडल विद्युत इंजीनियर (सामान्य) श्री सुमित गर्ग, वरिष्ठ मंडल विद्युत इंजीनियर (टीआरडी) श्री सतेन्द्र कुमार सिंह, वरिष्ठ मंडल परिचालन प्रबन्धक श्री अनूप कुमार सिंह, वरिष्ठ मंडल संरक्षा अधिकारी श्री सी.एल. साह, वरिष्ठ मंडल याँत्रिक इंजीनियर (ओ. एंड एफ.) श्री पवन कुमार शर्मा, मंडल सुरक्षा आयुक्त श्री अमिताभ सहित मंडल के अन्य अधिकारी उपस्थित थे।
Source...NER RAILWAY FACEBOOK ...

Translate to English
Translate to Hindi

11461 views
1

Aug 21 2019 (15:45)
SaurabhDubey^~
SaurabhDubey^~   30407 blog posts
Re# 4406128-3               Past Edits
#Atlasmonitors kalianpur to kannauj electrification to be updated on map.
Translate to English
Translate to Hindi
Info Update
51589 views
2

Mar 07 2018 (08:21)   13244/Bhabua Road - Patna InterCity Express (Via Gaya) | GAYA/Gaya Junction (10 PFs)
13YearsOnIRI^~
13YearsOnIRI^~   4683 blog posts
Entry# 3178611            Tags  
#FM #Admin plz update mps of Gaya Bela section that is 110 now. Proof attached
I m now travelling in 13244 depart Gaya at 7:58 am and arriving Bela that is 20 km from Gaya @8:12
Also the whole section is 110 mps. Budh Purnima and other covers this section in 1:30 hrs.
Translate to English
Translate to Hindi

4 Public Posts - Wed Mar 07, 2018

6 Public Posts - Fri Mar 09, 2018

18522 views
1

Mar 09 2018 (15:57)
NCR~   1626 blog posts
Re# 3178611-17              
Just use hashtag #AM or #AtlasMonitors.
Only those members can change the alignment of track who are Atlas Monitor.
Translate to English
Translate to Hindi

5 Public Posts - Fri Mar 09, 2018
Info Update
122438 views
5

Jan 16 2018 (12:35)   THAL/Thal
Ben_Kenobi~
Ben_Kenobi~   4222 blog posts
Entry# 3006840            Tags  
hello everyone, hope everyone's doing fine :)
before I yet again disappear for tens of weeks there is small electrification update i wish to make
So, few days back I was doing my usual Mumbai-Alibag-Mumbai weekend journey, when shortly after leaving Goa highway (NH 66) and turning on to NH 166A I spotted a weird grey looking pole obliquely standing in soil. That, as you might have guessed were new electric poles which were being erected. the next time I traveled that route I ws alert and wanted to see if there
...
more...
is any sign of electrification from PNVL end, but there isn't. Poles start appearing only after the line to TVSG (TVSG is the correct station code, not Thal as mentioned here) diverges out, but once they start appearing they are visible till quite some distance, until the track turns away. I believe the electrification has been started from TVSG end and will keep on progressing outward towards Panvel via Pen. This obviously needs cofirmation, and i infact know of a place not much far from the industry the line ends at which will allow me to see unhindered for almost 5-ish Kms close to the end of TVSG, but currently it is difficult for me to reach there.
why is this important?
Because the e-fication from TVSG is actually a part of the TVSG-PEN-PNVL e-fication project. It was mentioned first in the 2015-16 pinkbook, and the beginning and in fact rapid progress of the work currently indicates that the work may be complete by the end of the year. the next phase, involving PEN-ROHA electrification can then start which would allow for, if railways plans to, run some MEMU on the new slots created on the recently doubled line on PNVL-ROHA route.
what exactly is this line?
the lines where poles are currently visible is not a part of mainline, but is a rather long 'private siding' that is connected to three firms:
1)RCF Ltd, where the line ends.
2)PPDP (PNP Dharamtar port), not marked on atlas. I have indicated it in image attached though, on OSM
3)JSWD (JSW Dolvi), marked wrongly on atlas, the line diverges shortly after the private siding diverges from mainline. the poles, when i last saw them, stop short of the place where the diverging happens.
#atlasmonitors take note please and add the corrections, and update the line to electrification in progress from single diesel line
pinkbook for RE 2015-16, showing sanction fo funds for Panvel-Pen-TVSG electrification. the relevant line is on page number 6
click here
Place I have shown in image: click here

Translate to English
Translate to Hindi

5 Public Posts - Tue Jan 16, 2018

3 Public Posts - Mon Feb 12, 2018

1 Public Posts - Thu Feb 22, 2018

1 Public Posts - Sat Feb 24, 2018

1 Public Posts - Tue Mar 13, 2018
Info Update
17068 views
21

★★★
Jul 13 2017 (10:26)   JBP/Jabalpur (7 PFs)
robin~
robin~   6144 blog posts
Entry# 2350914            Tags  
#jbpnews
#JBPGELECTRIFICATIONUPDATES
#electrificationstartedinjbpgnssection
so another good news came for JBP passengers and railfans as electrification work started on KEQ-GNS section of JBP-BTC-G BG route and hopefully by next year we can expect work completion till GNS as target of electrification is given for 2017-18 of KEQ-GNS section so its very good for JBP Jn. as all sections will get electrified in
...
more...
the coming years and diesel territory tag will be removed soon from JBP also

Translate to English
Translate to Hindi

15 Public Posts - Thu Jul 13, 2017

9 Public Posts - Fri Jul 14, 2017

3 Public Posts - Mon Jul 17, 2017

6949 views
0

Jul 17 2017 (16:01)
shuk^~
shuk^~   4250 blog posts
Re# 2350914-36               Past Edits
#atlasmonitors please update the route at atlas
Translate to English
Translate to Hindi

2 Public Posts - Tue Jul 18, 2017
Page#    26 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy