Unrealistic speed.Runs in single line.Avg speed 68kmph!!
Yesvantpur-Hubli in 6.5hours whereas UBL JS takes 7.25 hours (fastest train in the stretch)
In Miraj-Karad section,the speed is highly unrealistic 75km in 28min,satara to pune 137kmph and only 2min halt at pune and 5min at Bangarapet.Not even a little slack time is given from Kalyan to Dadar(at 95kmph).Really a bad TT.