LSA not possible at MMR. The link which arrives with 12780 in the morning at BSL goes back to NZM in the afternoon with 12779. Things may change soon after completion of DD Pune electrification, but after shifting loco change at Pune NR GZB shed will have to allot one more P7 to it presently requires two P7s.