Hi everybody there has been ongoing etald rail electrification but y railway is not completing the patches in between like between shahpura sridham there is one part which has not been completed from long long time there is one local electricity transmission wire just going above OHE wire touching the line of OHE bcoz of which that part is lying without any progress apart from this bhedaghat station is also being electrified brackets have been completed full station both platforms means full OHE poles have been established fully with brackets on the poles but wires r lying lose on the poles don't have the pics but there has been patches of irregularities I hope all will get my point to understand this is looking as if it's not possible to get completed by March 2017 it could extend for long time by 1 more year thaks