Then I guess SBC Raj which got LGD WAP7 today, instead of GZB WAP7 (as some were saying), can be regular link to that train.
Because SBC has ETS which can look after (maintain) the loco link of that train with the LGD and RPM WAP7s it has. No need to depend on GZB.