3rd rake confired to be LHB
yesterdays there was fault in sk rake (12393) and it started late from rjpb
heres the detail..
12393
detention : 85 mins
ECR DNR...
more...
Eqpt. Failed
JUNCTION BOX DEFECTIVE
brief : (RJPB-NDLS), Late started Ex.RJPB for Coach No.16212/LWSCN/ECR Declared electrically sick for junction box defective & LWFAC/11002/ECR also detained for PP side blower motor defective. Same allowed for one trip by TLAC Staff and worked. Prim-RJPB, Station-RJPB, Time- 17.35-19.00 hrs