Electrification and doubling Update:
Route: Uthratia-Pratapgarh-Janghai section.
Zone:NR/LKO division.
*Uthratia-Bachhrawan Section: Wiring done doubling done KVG.
*Bachhrawan-Raibareli section: Wiring done and ground levelling done,track sleepers laid.
*Raibareli-Amethi...
more... Section: Potholes made till Jais ground levelling done Talkhajuri.No sign of poles or wiring.
Wiring done at Amethi but no sign of levelling.
*Amethi-Pratapgarh section: Poles till Chilbila,Wiring done till Antu. No sign of poles or wires between Chilbila and Pratapgarh. Ground levelling done from Misrauli to Chilbila.
*Pratapgarh-Janghai section: Poles,wiring and doubling done till Badshahnagar.
Pics shows..
1) Wiring done at Bachharawan by wiring man.
2) Pole at Rajiv Gandhi Petroleum Institute Jais.
3)Haridwar Allahabad Express at Kundanganj.
ENDEDWhat do you all think on this. Comment the pace and ingenuity of work.
100%
1