Yes you are right brother but their needs better signalling and controlling for high speeds. Is does lines laid in VSG GTL are different then what they now laying between ET NGP irrespective of being same 60kg rails ? If they differ in some designs in rail heads or any other changes then I can say yes for speeds they taking 60kg instead of 52kg irrespective of signal and control upgrades and also irrespective of line traffic capacity..