I don't understand what is the issue, when RC can have the slip and is also such a popular train (more popular than SG IMHO), then surely the slip arrangement can work with both trains. PM constraints is not an issue as well as the amaravati express is with SER and has SCR slip coaches from KCG-YPR express. At least in this case all trains are of SWR itself.