If the route between DLI & Gajraula and Najibabad & Dehradun is electrified, why is the train still a end to end diesel haul. After all, the train reverses direction at Gajraula and Najibabad so the schedule is unlikely to be affected. Or is allocation of 3 locos for the train a logistical difficultly ??