On Trip
Late: 34m late
@ HBLN/HBL Nagar
Speed: 82 km/h
Ground levelling works for the second track are moving swiftly, I guess, light wasn't enough for pics though.
On Trip
Late: 26m late
UR/Umdanagar 2.0 km<--->4.3 km BDVL/Budvel
Speed: 68 km/h
2nd track is laid.
On Trip
Late: 26m late
UR/Umdanagar 5.2 km<--->1.1 km BDVL/Budvel
Speed: 28 km/h
Ballast is laid, sleepers and rails are stashed by the side.