TKD WDP-4B 40079 Prateek At BTI/Bhatinda Junction On 2nd April 2021 With Isolation Rake Resting In Yard
It Came With 02455 DEE-BKN SF COVID-19 Special Failed Between BSS-BNN Then 49028 GIMB Was Provided At BNN And On Arrival At BTI It Was Detached And Further Train Was Restricted At 60 KMPH On BTI-SGNR Section.