**During the period of Mr Prabhu, it was reported that the doubling shall be done simultaneously in a few more stretches in addition to Roha-Veer, but that could not materialize.
** KR want to do doubling of long tunnels in the last phase to double maximum route KMs at minimum cost in shorter time.