The New Railway Station at Machilipatnam will have 3 New Platforms with length of 620m with 26 ICF/24 LHB Capacity. These Platforms can handle both ICF & LHB Coaches trains. 2 Pit lines & 1 stabling line present at MTM.
After opening of New Station building at MTM, old building is to be utilized for service of various departm
please wait...Translate to EnglishThe New Railway Station at Machilipatnam will have 3 New Platforms with a length of 620m with a capacity of 26 ICF/24 LHB. These Platforms can handle both ICF & LHB Coaches trains. 2 Pit lines & 1 stabling line are present at MTM.
After the opening of the New Station building at MTM, the old building is to be utilized for the service of various departments.