Some very good suggestions. Surprised to see that IRTTC proposals sent in May -22 are still not being implemented. IR should either accept or reject the proposals within a stipulated time frame. Secondly Bilara-Bar missing link survey report has been sent to HQ. Does anyone have summary of that report as in whats the ROI shown in that report. Now the MPs of Jodhpur /Pali/Ajmer should put pressure on the RM to get it sanctioned on urgent basis. This is very critical for connectivity from Ju to large parts of Central and South India. However, one point is missing that is the Mj-Mavli GC project. This should also have been part of this document. Not sure why it has been missed out.