Indore Ujjain Double Track: नए ट्रैक पर 120 किमी प्रति घंटा की गति से दौड़ेगा निरीक्षण यानThe double-tracking project on the Barlai to Lakshmibai Nagar section of the Ujjain-Dewas-Indore line of the Ratlam division of Western Railway has been completed. A speed trial will be conducted on the newly laid track with an inspection train running at 120 km/h on December 28th. This will be conducted by...
more... the Commissioner of Railway Safety (CRS), Western Circle, R.K. Sharma. The inspection will involve checking the railway track, bridges, culverts, approaches, and a motor trolley inspection will be conducted between intermediate stations. The public has been advised not to go near the doubled railway line from morning to night and to keep their pets away from the railway track. Due to the double-tracking work, the Western Railway has taken a long block between Barlai and Lakshmibai Nagar. Several trains have been rerouted via Fatehabad, while others have been cancelled or short-terminated. Train operations on this route will resume after the CRS inspection.
Western Railway ke Ratlam division ke Ujjain-Dewas-Indore line pe Barlai se Lakshmibai Nagar tak ka double-tracking project poora ho gaya hai. 28 December ko CRS, Western Circle, R.K. Sharma, new track pe 120 km/h speed se inspection train chalake capacity check karenge. Isme railway track, bridges, culverts, approaches check kiya jaayega...
more... aur intermediate stations ke beech me motor trolley inspection bhi hogi. Public ko morning se raat tak double-track ke paas jaane se aur apne pets ko railway track ke paas jaane se rokne ke liye kaha gaya hai. Double-tracking work ke liye Western Railway ne Barlai aur Lakshmibai Nagar ke beech me long block liya hai. Kuch trains ko Fatehabad route se chalaaya ja raha hai aur kuch trains cancel ya short-terminate ki gayi hai. CRS inspection ke baad is route pe trains ka operation start hoga.