I am not doing comparisions. I am saying that in general, It makes no sense to keep the duronto travel time much longer, just because there are goods train and Rajdhani's pride should be maintained. Duronto service as well cost is close to same as that of Rajdhani and is mentioned as Rajdhani type train in the official site. Plus one point is there that they dont take extra halts that rajdhani takes and hence, they are faster than the rajdhani counterparts like SDAH drnt, HWH Drnt, YPR Drnt, SC Drnt(down direction), BBS Drnt and it also replicates the rajdhani like Mas Drnt. Only section of slower speed for duronto is WR. I had co-passenger in 12951, a WR signal man. He was not ready to accept the fact Sealdah drnt take lesser time than the Hwh Rajdhani. He was telling that this is never possible. so, I can guess...
more... the mentality of WR crew about slow speeds of ERS NZM Drnt and BCT NDLS Drnt.
And for your this statement ......''''''''Both being having same speed restriction, covering almost same distance and enjoying equal priority then how can railways expect it to cover it in almost 30mins faster???''''''.......... The fact is there is no need to expect!! as Reality is Duronto takes 30 mins lesss than the rajdhani .
Again coming to your this statement in relation to comparision of HWH Raj and SDAH Drnt i.e drnt being 30-40 mins faster and rajdhani taking two extra halts.
I gave an example of DOWN 12285 SC Duronto and 12437 SC Rajdhani. Rajdhani takes just one extra halt and still duronto take 30 mins lesser than the rajdhani to arrive NZM. Comparision here is of Hybrid LHB Rake of mps 120kmph and icf Rajdhani rake of mps 130kmph. Tracks same as those of the fastest train of india, which might be surely touching 130kmph atleast. Still the hybrid lhb with max 125kmph mps manages to reach with 30 min lesser time than the icf rajdhani that has mps 130kmph. so, This proves that a extra halt may matter in the case of down SC Rajdhani and Drnt to make a diff of 30 mins. so, definitely HWH Rajdhani taking 2 extra halt will surely increase its travel if hwh raj is to b given sdah drnt travel tym. Plus MGS-NDLS Route is the most busy route of India... 6 Rajdhanis, 4 GRs, 1 yuva, 4 Drnts, 2 shatabdis, so many sf & non sf plus special trains. so, it not easy for a train i.e HWH Raj to take halts and also cover the travel and get equal to duronto, which avoid those halts.
And about Comparisions yes, surely can made. In busy route, MGS-NDLS, Duronto run faster than thier rajdhanis counterparts i.e hwh drnt than sdah raj, sdah drnt than hwh raj, bbs drnt than bbs raj. Then why cant the duronto run with high speed in WR section????? BCT-NDLS route is surely not as packed as packed as MGS-NDLS route. BCT-NDLS, ERS-NZM can surely do great speed but are purposely neglected. ERS Drnt doesnt have that much filling but still that doesnt mean slower the so called non-stop train as it doesnt provide intermediate halts