दो साल में पूरा हो जाएगा आम घाट रेलवे ओवरब्रिज का निर्माण: अनुप्रियाUnion Minister of State for Commerce and Industry, Anupriya Patel, laid the foundation stone for an overbridge at the Am Ghat railway crossing on the Mirzapur-Chunar railway line in the Majhwaan assembly constituency on Monday. The overbridge is expected to be completed within two years and will cost approximately ₹63 crore....
more... The overbridge is expected to ease traffic congestion and reduce travel time for people travelling from Mirzapur to Chunar and Varanasi via Am Ghat. The event was attended by several BJP and Apna Dal leaders, including Majhwaan MLA Dr. Vinod Bind, BJP District President Brijbhooshan Singh, and Apna Dal (S) District President Ram Loutan Bind.
Union Minister of State for Commerce and Industry, Anupriya Patel ne Monday ko Majhwaan assembly constituency mein Mirzapur-Chunar railway line par Am Ghat railway crossing pe banne wala overbridge ka shilaanayas kiya. This overbridge, which will cost around 63 crore rupees, is expected to be completed in two years. Is...
more... overbridge se Mirzapur se Chunar aur Varanasi jaane wale logon ko traffic jam se relief milega aur travel time kam hoga. This event mein, Majhwaan MLA Dr. Vinod Bind, BJP District President Brijbhooshan Singh, aur Apna Dal (S) District President Ram Loutan Bind bhi maujood the.