Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Sep 17 17:34:31 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5958649
Posted: Feb 01 (22:15)

No Responses Yet
Rail News
1563 views
0

Metro
CMRL/Chennai Metro
Feb 01 (22:15)   Chennai Metro Begins Tunnelling Work on Corridor-4 of Phase-2

Exynos9611~   19374 news posts
Entry# 5958649   News Entry# 539678         Tags   Past Edits
Chennai: CMRL starts tunnelling 2.1-km stretch from Panagal Park to Kodambakkam

Chennai Metro Rail Limited started tunnelling work for a 2.1-km underground stretch from Panagal Park in T Nagar to Kodambakkam, part of the corridor-4 under the second phase. The tunnelling machine, Pelican, will operate at a maximum depth of 18.5m and is expected to complete the work by December 2024. This...
more...
machine will pass under the North Usman Road and Kodambakkam flyovers. After completion, it will start tunnelling from Panagal Park towards Boat Club Station. Another tunnel boring machine, Peacock, will begin work on April 1st, 2024, from Panagal Park to Kodambakkam Powerhouse Ramp. The 26.1-km corridor-4 is part of the 116.1-km phase-2, which is scheduled for completion in stages between 2025 and 2028.

Chennai Metro Rail Limited ne Wednesday ko Panagal Park, T Nagar se Kodambakkam tak 2.1-km underground stretch ke liye tunnelling ka kaam start kiya hai. Ye corridor-4 ka hissa hai, jo second phase ka kaam hai. Pelican naam ka tunnel boring machine, 18.5m ki maximum depth pe kaam karega aur December...
more...
2024 tak khatam hone ki umeed hai. Ye machine North Usman Road aur Kodambakkam flyover ke neeche se gujarega. Kaam khatam hone ke baad, ye Panagal Park se Boat Club Station ki taraf tunnelling shuru karega. Ek aur tunnel boring machine, Peacock, April 1st, 2024 ko Panagal Park se Kodambakkam Powerhouse Ramp tak kaam shuru karega. 26.1-km corridor-4, 116.1-km phase-2 ka hissa hai, jiske stages mein 2025 aur 2028 ke beech complete hone ki ummeed hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3090937 ★★★ 70KeepTravelling^~
2537064 ★★★ 65~
1959644 ★★★ 267Arpit~
2308508 ★★★ 35Yantravinyas
3619297 ★★★ 400HBR^~
4948161 ★★★ 44SCoR~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy