Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Oct 6 14:43:05 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5971676
Posted: Feb 16 (23:07)

No Responses Yet
Rail News
68718 views
1

IR Affairs
NCR/North Central
Feb 16 (23:07)   Trial Run Successful for Jaura-Kailaras Broad-Gauge Line, MEMU Train Service to Launch Soon

AdittyaaSharma^~   74520 news posts
Entry# 5971676         Tags   Past Edits
जौरा-कैलारस के बीच नए ट्रैक पर 120 किमी की रफ्तार में दौड़ी ट्रेन, नए ट्रैक पर ट्रायल

A successful trial run of a train was conducted on the newly constructed broad-gauge railway track between Jaura and Kailaras, part of the third phase of the Newajyotipur-Morena-Gwalior broad-gauge line. The trial run was conducted under the supervision of the Commissioner of Railway Safety (CRS) at a speed of 120 kilometers...
more...
per hour. Railway officials declared the trial successful and are preparing to launch a MEMU train service between Gwalior and Kailaras by the end of this month. The first phase of the broad-gauge line, between Gwalior and Sumawali, was completed and inaugurated by Prime Minister Modi on Gandhi Jayanti. The second phase, covering Sumawali to Jaura-Alappur, was also completed and successfully tested two months ago. The third phase, encompassing Jaura-Alappur to Kailaras, spans 13 kilometers. Before the trial run, the CRS and railway officials thoroughly inspected the track, including its traction, signaling, gates, bridges, track points, and other functionalities. Following this, the trial run was conducted at 120 km per hour. The track from Kailaras to Sabalgarh, which is 95% complete, is being constructed at a height of 20 feet. The laying of tracks from Kailaras to Sabalgarh is underway, and upon completion, the total track length will reach 94 kilometers, nearly half of the total length between Gwalior and Sheopur. Bridge construction is in progress between Sabalgarh and Sheopur's Veerpur, with the largest bridge being built over the Kuno River. The MEMU train service between Gwalior and Sumawali currently has 8 coaches, but most of them run empty due to low passenger numbers, resulting in significant losses for the railway. The MEMU train service between Jaura and Sumawali runs three times a day. Railway officials believe that the launch of the Gwalior-Kailaras route will increase passenger numbers and necessitate adjustments to train schedules and frequencies. The railway team will now inspect the power lines before commencing the MEMU train service from Gwalior to Kailaras, which is expected to begin by the end of February.

Jaura aur Kailaras ke beech banaye gaye broad-gauge railway track pe, jo ki Newajyotipur-Morena-Gwalior broad-gauge line ke teesre phase ka hissa hai, ek train ka trial run successfully kiya gaya. Yeh trial run Commissioner of Railway Safety (CRS) ki dekh-rekh mein 120 kilometers per hour ki speed pe kiya gaya. Railway...
more...
officials ne is trial ko successful bataya aur is mahine ke aakhir tak Gwalior se Kailaras tak MEMU train service shuru karne ki taiyari kar rahe hain. Broad-gauge line ka pehla phase, Gwalior aur Sumawali ke beech, pura ho gaya tha aur usko Prime Minister Modi ne Gandhi Jayanti pe shuru kiya tha. Dusra phase, Sumawali se Jaura-Alappur tak, bhi pura ho chuka hai aur do mahine pehle iska trial run successfully ho gaya tha. Teesra phase, Jaura-Alappur se Kailaras tak, 13 kilometers lamba hai. Trial run se pehle, CRS aur railway officials ne track ka ghanta nirikshan kiya, jismein traction, signaling, gates, bridges, track points, aur aise hi kuchh aur functionalities shamil the. Iske baad, trial run 120 km per hour ki speed pe kiya gaya. Kailaras se Sabalgarh tak ka track, jo ki 95% pura ho chuka hai, 20 feet ki unchaai pe banaaya ja raha hai. Kailaras se Sabalgarh tak track lagane ka kaam chal raha hai, aur iske pura hone pe, track ki kul lambai 94 kilometers ho jayegi, jo ki Gwalior aur Sheopur ke beech ki kul lambai ka aadha hai. Sabalgarh aur Sheopur ke Veerpur ke beech bridge banne ka kaam chal raha hai, jismein sabse bada bridge Kuno River pe banaaya ja raha hai. Gwalior aur Sumawali ke beech chalne wali MEMU train mein 8 coaches hain, lekin inme se zyadatar coaches khali chalte hain, kyonki yah route pe railway ko passengers hi nahi mil rahe, jiski wajah se railway ko har roz laakhon rupaye ka nuksan ho raha hai. Jaura aur Sumawali ke beech chalne wali MEMU train din mein teen baar chalti hai. Railway officials ka मानना hai ki Gwalior-Kailaras route shuru hone pe, train ki frequency aur timings mein badlaav aayega. Sumawali ke alawa, Jaura aur Kailaras ke passengers ko ab Gwalior se direct connection milega, jiske wajah se train ko passengers ka aavishkaar milega. Railway team ab power lines ka nirikshan karegi, iske baad MEMU train service Gwalior se Kailaras tak shuru kar di jayegi, jiske February ke aakhir tak shuru hone ki sambhavna hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy