Buxar: 26 फरवरी को इटाढ़ी फुटओवर ब्रिज का वर्चुअली उद्घाटन करेंगे पीएम मोदी, कई रेल परियोजनाओं का शिलान्यास भी करेंगेOn February 26th, Prime Minister Narendra Modi will virtually inaugurate and lay the foundation stone for several railway projects in Buxar district. This includes the development of Chausa railway station under the Amrit Bharat Station scheme, the inauguration of a foot overbridge at the level crossing near Itarhi Road, and potentially...
more... the inauguration of a foot overbridge on the platform at Tudiganj railway station. Local events are planned for each station, potentially including local MPs and MLAs. The foot overbridge near Itarhi railway crossing is completed and will open on the 26th, offering pedestrians and two-wheeled vehicles an alternative to the level crossing, reducing traffic congestion. This foot overbridge is part of a larger 16.85 crore rupees project including an overbridge, and it is expected that the level crossing will eventually be closed for vehicular traffic once the overbridge is completed. The foot overbridge is designed to provide pedestrian and two-wheeled vehicle access when the level crossing is closed due to the construction of the overbridge.
26 February ko, Prime Minister Narendra Modi Buxar district mein kai railway projects ka inauguration aur shilaanayaas karenge, yeh sab virtual tarike se hoga. Chausa railway station ko Amrit Bharat Station scheme ke tahat develop kiya jaayega, iski planning ka shilaanayaas bhi us din hoga. Itarhi Road mein Buxar railway station...
more... ke paas level crossing pe foot overbridge ka inauguration bhi hoga. Tudiganj railway station ke platform pe bane foot overbridge ka bhi inauguration us din hone ki ummeed hai. Har station pe local level pe events rakhne ki planning hai, jisme local MP aur MLA ko invite kiya jaa sakta hai. Itarhi railway crossing ke paas foot overbridge ban kar taiyaar ho chuka hai aur yeh 26th se open ho jaayega. Isse level crossing pe jam se relief milega. Is FOB pe dopahiya vaahan aur E-ricksha ke saath logon ko chalne ka mauka milega. Is project ki cost 16.85 crore rupees hai aur isme foot overbridge ke saath saath overbridge bhi ban raha hai. Jab overbridge ban kar taiyaar ho jaayega tab level crossing ko band kar diya jaayega. Is foot overbridge ko local logon aur dopahiya vaahanon ke liye banaya gaya hai, taaki jab level crossing band ho tab unhe crossing karne ka option ho.