एफओबी के पिलर को बदलने की तैयारी, ट्रैफिक ब्लॉक की डिमांडA damaged pillar on a foot overbridge (FOB) at Gorakhpur Junction will be replaced soon. The decision to replace the pillar was taken after the Chief Bridge Engineer inspected the site following a report in the Hindustan newspaper about the tilted pillar. The engineering department has requested a traffic block from...
more... the operations department to carry out the replacement. The FOB on platform number 2 has a tilted pillar on the side towards platform number 5 and 6. It is suspected that a goods train might have hit the pillar with its open door. While the FOB is currently supported and safe for now, it requires immediate repair to prevent future risks. The FOB on platform number 1 has been closed for the past six months. The railway administration plans to install signage to guide passengers.
Gorakhpur Junction ke foot overbridge (FOB) pe ek damaged pillar ko jaldi hi badala jaayega. Hindustan newspaper mein tilted pillar ki khabar aane ke baad Chief Bridge Engineer ne mauke par jaake inspection kiya aur pillar ko badalne ka faisla liya. Engineering department ne operation department se traffic block ki request...
more... ki hai. Platform number 2 pe bane FOB ke ek pillar ka side jo platform number 5 aur 6 ki taraf hai, wo tedha ho gaya hai. Suspect kiya ja raha hai ki kisi goods train ke open door se pillar ko takkar lagi hogi. Abhi FOB ko support deke safe bana hua hai, lekin future risks ko rokne ke liye isko jaldi se repair karna jaruri hai. Platform number 1 pe bana FOB pichhle six months se band hai. Railway administration passengers ke liye signage install karne ki planning kar raha hai.