Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 16 18:56:01 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6105807
Posted: Jun 25 (20:18)

No Responses Yet
Rail News
5120 views
0

IR Affairs
Jun 25 (20:18)   Trains on Howrah-Patna Railway Line to Run at 130 km/h

Exynos9611~   19291 news posts
Entry# 6105807   News Entry# 557663         Tags   Past Edits
Howrah Patna Rail Line: हावड़ा-पटना रेलमार्ग पर अब 130 की रफ्तार से दौड़ेगी ट्रेनें, रेलवे ने कर दिया इंतजाम

The Howrah-Patna railway line will now see trains running at a speed of 130 km/h. The Indian Railways has completed all necessary arrangements for this increase in speed, which will significantly reduce travel time for passengers. The railway tracks have been upgraded, and the weight of the rails has been increased...
more...
to support the higher speed. This speed increase will apply to trains traveling between Patna and Howrah. The speed increase is specifically for the Sitamarampur-Jhajha section of the Asansol division of the Eastern Railway. Previously, the speed limit on this section was 110 km/h. The tracks between Sitamarampur-Howrah and Jhajha-Patna have been upgraded to accommodate the higher speed. Railway workers have been working on this section for the past two years to ensure the safety and effectiveness of the speed increase. The Asansol PRO confirmed that the tracks have been upgraded and trains will operate at 130 km/h after approval from senior officials. Senior officials have already conducted multiple trial runs on the section using a special train. On Monday, the Asansol Divisional Manager, Chetananand Singh, inspected the safety of the route with senior officials aboard the 22348 Patna-Vande Bharat Express. The increased speed will reduce travel time to stations like Howrah, Kolkata, Bardhaman, and Asansol. The railway tracks have undergone significant repairs over the past two years. The weight of the rails has been increased from 52 kg per meter to 60 kg per meter. The replacement of rails was completed quickly by railway workers. Additionally, the replacement of girders on all bridges along the route was completed in a timely manner. The railway conducted mega blocks to replace the girders on bridges dating back to the British era. On January 28th and February 11th, the girder of the railway bridge over the Badua River near Simultola station was replaced during a mega block. The Sitamarampur-Jhajha section contains 37 subways, which are being converted to underground passages. On March 3rd, the LHS (Limited Height Subway) gate number 31, kilometer number 326/25-27 between Jasidih-Tulsiatand stations was replaced during a block. On the same day, the LHS gate number 33, kilometer number 336/23-25 between Tulsiatand-Lahaban railway stations was also scheduled for conversion to an underground passage, but this was not possible due to technical issues. This gate was eventually converted on March 17th along with the conversion of the Rajla gate number 37, kilometer number 361/10-12. The Simultola gate is also scheduled for conversion, and the tender for this work has already been finalized.

Hawrah-Patna railway line pe ab trains 130 ki raftar se daudenge. Railway ne yeh sab kuch kar liya hai. Isse passengers ka time bahut bachega. Railway ne tracks ko durust kiya hai aur unka weight bhi badha diya hai. Ab Patna se Hawrah tak train ki speed 130 ho jayegi. Yeh...
more...
speed increase specifically Sitamarampur-Jhajha section, Asansol division, Eastern Railway ke liye hai. Pehle, is section pe speed limit 110 km/h thi. Sitamarampur-Howrah aur Jhajha-Patna ke beech track ko upgrade kar diya gaya hai. Railway workers 2 saal se is section pe kaam kar rahe the. Asansol PRO ne confirm kiya ki tracks upgrade ho gaye hain aur senior officials ki approval ke baad trains 130 km/h se daudenge. Senior officials ne special train se is section pe bahut saare trial runs kar liye hain. Monday ko, Asansol Divisional Manager, Chetananand Singh ne 22348 Patna-Vande Bharat Express pe senior officials ke saath route ki safety check ki. Speed increase se Howrah, Kolkata, Bardhaman, aur Asansol jaise stations tak pahunchne mein time kam lagega. Railway tracks pe 2 saal se repair ka kaam chal raha hai. Rails ka weight 52 kg/meter se badha kar 60 kg/meter kar diya gaya hai. Railway workers ne rails ko jaldi se badal diya. Iske saath hi, route ke sabhi bridges ke girders ko bhi time pe badal diya gaya hai. British era ke bridges ke girders ko badalne ke liye railway ne mega blocks kiye. 28 January aur 11 February ko, Simultola station ke paas Badua River pe railway bridge ka girder mega block kar ke badal diya gaya. Sitamarampur-Jhajha section mein 37 subways hain, jinhe underground passages mein badala ja raha hai. 3 March ko, Jasidih-Tulsiatand stations ke beech LHS (Limited Height Subway) gate number 31, kilometer number 326/25-27 ko block kar ke badal diya gaya. Usi din, Tulsiatand-Lahaban railway stations ke beech LHS gate number 33, kilometer number 336/23-25 ko bhi underground passage mein badala jaana tha, lekin technical issues ki wajah se yeh nahin ho saka. Yeh gate finally 17 March ko, Rajla gate number 37, kilometer number 361/10-12 ko badalte hue ek hi din mein badal diya gaya. Simultola gate ko bhi jaldi se badalne ka kaam proposed hai aur is kaam ka tender bhi final ho chuka hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

4948161 ★★★ 44SCoR~
5968612 ★★★ 49ShivaankVaibhav~
6186110  15Rail_0326~
3619297 ★★★ 399HBR^~
3368675 ★★★ 396mr.train_wala~
6007860 ★★★ 117RailwayFiles~
6186432 ★★★ 43PankajMishra^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy