Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 20 05:00:03 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6149464
Posted: Aug 07 (19:38)

No Responses Yet
Rail News
1343 views
0

IR Affairs
NER/North Eastern
Aug 07 (19:38)   DRM Varanasi Conducts Safety Inspection of Chhapra-Siwan Rail Section

Exynos9611~   19577 news posts
Entry# 6149464         Tags   Past Edits
छपरा-सिवान रेलखंड पर दौड़ी निरीक्षण यान ट्रेन , DRM ने की रेलवे ट्रैक की स्क्रीनिंग

The Divisional Railway Manager (DRM) of Varanasi Division, Vineet Kumar Srivastava, conducted a window trailing safety inspection of the Chhapra-Siwan rail section. The inspection covered safety aspects of train operations, passenger safety, development works under the Amrit Bharat scheme, and overall safety of the section. The DRM inspected the Siwan Railway...
more...
Station in detail, checking facilities like station panels, building, platforms, passenger sheds, foot overbridges, food & vending stalls, waiting rooms, circulating areas, entry & exit routes, cleanliness, and maintenance. He also inspected the proposed layout of the Amrit Bharat station and instructed officials to complete the work within the deadline. The DRM then inspected the goods shed and instructed officials to maximize goods loading. The inspection also included safety-related aspects like relay rooms, IPS rooms, points crossings, key handover procedures, maintenance registers, cancellation counters, and registers. The DRM emphasized strict adherence to safety regulations. The inspection covered various aspects like operational safety, progress of development works, passenger amenities, cleanliness, water availability, compliance with temporary caution orders, and retraining of safety-related personnel. The DRM also examined the railway track, ballast, track screening, overhead traction, alignment, caution orders, and track fittings for safety. Senior Divisional Engineer (First) Rishi Srivastava, Deputy Chief Engineer (Power) I.C. Subhash, Assistant Divisional Engineer Siwan Rajesh Kumar Mishra, Assistant Operations Manager (Coaching) Hira Lal, Public Relations Officer Ashok Kumar, and senior supervisors and railway staff were present during the inspection.

Varanasi Division ke DRM Vineet Kumar Srivastava ne Chhapra-Siwan rail section ka window trailing safety inspection kiya. Isme train operation ki safety, passenger safety, Amrit Bharat scheme ke under chal rahe vikas kaam, aur section ki overall safety check ki gayi. DRM ne Siwan Railway Station ka detailed inspection kiya, jisme...
more...
station panels, building, platforms, passenger sheds, foot overbridges, food & vending stalls, waiting rooms, circulating areas, entry & exit routes, cleanliness, aur maintenance check kiya gaya. Unhone Amrit Bharat station ke proposed layout ka bhi inspection kiya aur officials ko deadline ke andar kaam complete karne ke liye instructions diya. DRM ne goods shed ka bhi inspection kiya aur officials ko maximum goods loading karne ke liye instructions diya. Inspection mein safety related aspects bhi include the, jaise relay rooms, IPS rooms, points crossings, key handover procedures, maintenance registers, cancellation counters, aur registers. DRM ne safety regulations ka strictly follow karne ka direction diya. Inspection mein operational safety, vikas kaam ki progress, passenger amenities, cleanliness, water availability, temporary caution orders ka compliance, aur safety related personnel ki retraining bhi check ki gayi. DRM ne railway track, ballast, track screening, overhead traction, alignment, caution orders, aur track fittings ki safety bhi check ki. Senior Divisional Engineer (First) Rishi Srivastava, Deputy Chief Engineer (Power) I.C. Subhash, Assistant Divisional Engineer Siwan Rajesh Kumar Mishra, Assistant Operations Manager (Coaching) Hira Lal, Public Relations Officer Ashok Kumar, aur senior supervisors aur railway staff inspection mein maujood the.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

1959644 ★★★ 269Arpit~
6191858  13SreeNdl^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy