The LJN Shatabdi and this VB run back to back. What's the point of giving two halts then? As it is, this train reaches a poor terminal [ANVT] too late in the night, giving additional halts is not gonna help it. Or IR can just speed up LJN Shatabdi by removing ALJN halt from it. After all, the Shatabdi didn't used to originally halt at ALJN either.