Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sat Sep 7 08:47:13 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 561764
Jul 23 (20:14) Bhopal Metro Construction Gains Momentum with Bridge Approvals (www.inhnews.in)
Metro
4309 views
0

News Entry# 561764   
  Past Edits
Jul 23 2024 (20:14)
Station Tag: Bhopal Junction/BPL added by Exynos9611~/2099623
Stations:  Bhopal Junction/BPL  
read full article... Bhopal Metro : भोपाल मेट्रो का काम हुआ तेज, सड़क और रेलवे ट्रैक के ऊपर ब्रिज बिछाने की मिली मंजूरी

Bhopal's metro construction is progressing rapidly. Two steel bridges, each over 100 meters long, are being constructed to allow the metro line to cross over existing roads and railway tracks. The bridges, designed similar to those used in Delhi's metro system, were fabricated in Alwar, Rajasthan. The first bridge,...
more...
measuring 15 meters wide and 14 meters high, will be situated near the railway line between RKMSP and the DRM office. The second bridge, spanning 48 meters in length and 14 meters in height, will be located at the DRM office intersection after the railway crossing. Both bridges are designed to allow unimpeded traffic flow beneath them. The railway authorities have granted permission for the construction of the bridge over the tracks, with a specific date for the necessary track blockage yet to be decided. During this blockage, some train services may be diverted. The metro corporation must install the bridges onto their pillars within the specified timeframe. The bridges have already been assembled.

Bhopal mein metro ka kaam bahut jaldi chal raha hai. Do steel bridges, har ek 100 meter lamba, banaye ja rahe hain taaki metro line road aur railway track ke upar se ja sake. Bridges ko Delhi metro ke jaise design kiya gaya hai, aur yeh Rajasthan ke Alwar...
more...
mein banaye gaye hain. Pehla bridge, 15 meter chauda aur 14 meter uncha, RKMSP aur DRM office ke beech railway line ke paas rakha jayega. Dusra bridge, 48 meter lamba aur 14 meter uncha, DRM office chouraha pe railway crossing ke baad banaya ja raha hai. Dono bridges ko is tarah se banaya gaya hai ki niche se gaadiya aaram se nikal sake. Railway authorities ne track ke upar bridge banane ki permission de di hai, lekin block kahan karenge yeh abhi decide nahin kiya gaya hai. Is din kuchh trains ko divert bhi kiya ja sakta hai. Metro corporation ko bhi time pe bridges ko pillar pe lagana hoga. Bridges ko assemble kiya ja chuka hai.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy