Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sat Sep 14 07:42:25 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 566995
Aug 28 (19:57) Automatic Block Signaling System Being Implemented on East Central Railway Section
IR Affairs
ECR/East Central
17045 views
1

News Entry# 566995   
  Past Edits
Aug 28 2024 (23:29)
Station Tag: Sasaram Junction/SSM added by AdittyaaSharma^~/1421836

Aug 28 2024 (23:29)
Station Tag: Saidraja/SYJ added by AdittyaaSharma^~/1421836

Aug 28 2024 (23:29)
Station Tag: Gurpa/GAP added by AdittyaaSharma^~/1421836

Aug 28 2024 (23:29)
Station Tag: Manpur Junction/MPO added by AdittyaaSharma^~/1421836

Aug 28 2024 (23:29)
Station Tag: Anugraha Narayan Road/AUBR added by AdittyaaSharma^~/1421836

Aug 28 2024 (23:29)
Station Tag: Koderma Junction/KQR added by AdittyaaSharma^~/1421836

Aug 28 2024 (23:29)
Station Tag: Gaya Junction/GAYA added by AdittyaaSharma^~/1421836

Aug 28 2024 (23:29)
Station Tag: Pradhankhunta Junction/PKA added by AdittyaaSharma^~/1421836

Aug 28 2024 (23:29)
Station Tag: Pt. DD Upadhyaya Junction (Mughalsarai)/DDU added by AdittyaaSharma^~/1421836
ऑटोमेटिक ब्लॉक सिगनलिंग सिस्टम से युक्त होगा डीडीयू-गया-प्रधानखंटा रेलखंड

The 417 km long Pandit Deen Dayal Upadhyay-Gaya-Pradhankhunta rail section on the East Central Railway is being equipped with an automatic block signaling system. A total of 61.86 km of track has already been commissioned with this system. The automatic block signaling system has been commissioned on the Anugraha Narayan Road-Pahalja...
more...
(23 km) and Manpur-Gurpa (38.86 km) rail sections and is operational. The commissioning of the automatic block signaling system on the 23.63 km long Pandit Deen Dayal Upadhyay-Saidraja and 13.4 km long Pahleja-Sasaram rail sections is scheduled to be completed by the end of September. Currently, the traditional signaling system is in use, which allows trains to proceed only after the preceding train has reached the next station.

East Central Railway pe, 417 km lamba Pandit Deen Dayal Upadhyay-Gaya-Pradhankhunta rail section ko automatic block signaling system se laise kiya ja raha hai. Isme, almost 61.86 km rail section par automatic block signaling system ka commissioning ho chuka hai. Anugraha Narayan Road-Pahalja (23 km) aur Manpur-Gurpa (38.86 km) rail section...
more...
par automatic block signaling system ka commissioning ho chuka hai aur ye kaam karna start ho gaya hai. 23.63 km lamba Pandit Deen Dayal Upadhyay-Saidraja aur 13.4 km lamba Pahleja-Sasaram rail section par automatic block signaling system ka commissioning September ke end tak complete ho jaayega. Aabhi, traditional signaling system chal raha hai jisme ek block section se aage ki train ko green signal tabhi milta hai jab pehle wali train next station par pahunch jaati hai.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy