Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Fri Sep 13 00:46:00 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 566257
Aug 23 (05:58) Indian Railways Revises Vande Bharat Train Order: 80 Sets with 24 Coaches Each
New Facilities/Technology
CR/Central
19170 views
3

News Entry# 566257   
  Past Edits
Aug 23 2024 (05:58)
Station Tag: Integral Coach Factory/XX-ICF added by Sameer2905^~/1864147

Aug 23 2024 (05:58)
Station Tag: Latur/LUR added by Sameer2905^~/1864147
New Vande Bharat trains to have 24 coaches instead of 16; Indian Railways revises Rs 35,000 crore order; check key details

The Indian Railways has revised its Vande Bharat train order. Originally planned for 120 sets with 16 coaches each, the order has been changed to 80 sets with 24 coaches each. The first prototype of the new model is expected in September 2025, followed by the second in November. This new...
more...
train will be manufactured by Kinet Railway Solutions, a joint venture of RVNL, Metrowagonmash, and LES. The project aims to eventually produce 2,500 high-speed trains by 2047, replacing older train sets. The use of aluminium instead of steel is expected to improve speed and cost efficiency.

Indian Railways ne apne Vande Bharat train ke order mein badlaav kiya hai. Pehle, 120 sets banne the, har set mein 16 coaches the, lekin ab yeh order badal kar 80 sets ho gaya hai, aur har set mein 24 coaches honge. Is model ka pehla prototype September 2025 mein aayega,...
more...
aur dusra November mein. Yeh naya train Kinet Railway Solutions banayega, jo ki RVNL, Metrowagonmash, aur LES ka joint venture hai. Is project ka maqsad 2047 tak 2,500 high-speed trains banana hai, jiske saath hi purane train sets badal diye jayenge. Is mein steel ki jagah aluminium ka istemaal kiya jaayega, jisse speed aur cost efficiency mein sudhaar aayega.

1 Posts

Rail News
17054 views
0

Aug 23 (05:58)
Sameer2905^~
Sameer2905^~   17250 blog posts
Re# 6165549-2              
FYI👆
Translate to English
Translate to Hindi

2 Posts

12915 views
1

Aug 23 (09:19)
deepak.yerr~
deepak.yerr~   6582 blog posts
Re# 6165549-5              
IR has changed the length of VB sleeper trains from 16 to 24 coaches and will include luggage vans, pantry car, may be restaurant seating car. So as pantry is included the design of the coach will be changed the present hot buffet arrangements in the coach will pave way for berths. The overall capacity of the train will increase considerable from the earlier 823 traveller berth to over 1200 which means a complete new design from the prototype being manufactured in BEML. The target date next Sep 2025 may be stretched to 2026 Q1 as the design has to start from scratch. The cost of the train set will increase from the present Rs 120 cr per trainset to 180cr which is not mentioned in the article. There is no clear information whether the L2 Titagarh has also been asked to change the specifications for 80 trainsets which has...
more...
already designed the concept, production procuremnt plan and target to roll out in July 2025. The tenders are already are old by an year and IR with RM changes specifications the project will be delayed which is to be on track in T20. (2020).

Translate to English
Translate to Hindi

7911 views
0

Aug 23 (20:28)
Sameer2905^~
Sameer2905^~   17250 blog posts
Re# 6165549-6              
Looking at this info and the rate they're going, I'm thinking they might start post Q2 of 2025...🤔🤔
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy