Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Tue Sep 10 04:56:14 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 563950
Aug 07 (16:39) Kolkata Metro Upgrades Blue Line with Energy-Saving Aluminum Third Rail
Metro
KM/Kolkata Metro
IR Press Release
16675 views
0

News Entry# 563950   
  Past Edits
Aug 07 2024 (16:39)
Station Tag: Dakshineswar/DAKE added by jishnuthakur12301^~/1777975

Aug 07 2024 (16:39)
Station Tag: New Garia/NGRI added by jishnuthakur12301^~/1777975

Aug 07 2024 (16:39)
Station Tag: Dum Dum Junction/DDJ added by jishnuthakur12301^~/1777975
STEEL THIRD RAIL REPLACEMENT WORK WITH HIGHLY CONDUCTIVE ALUMINIUM THIRD RAIL FOR STOPING 50000 TONS CARBON EMISSION STARTED IN BLUE LINE

Kolkata Metro is replacing its existing steel third rail with a highly conductive aluminum third rail on the Blue Line. This initiative will significantly reduce energy losses, leading to faster train acceleration and shorter travel times. The new aluminum third rail, manufactured in Germany, has been shipped to Kolkata and installation...
more...
has begun at Girish Park and Maidan stations. The project aims to replace 35 km of third rail over the next two years. This upgrade will improve efficiency, reduce operational costs, and decrease carbon emissions by 50,000 tons over the lifetime of the aluminum third rail. The aluminum third rail requires less maintenance, is more stable, and generates less heat in the tunnels. The work is being done during the night to avoid disrupting regular service.

Kolkata Metro apna Blue Line pe existing steel third rail ko highly conductive aluminium third rail se replace kar raha hai. Isse energy loss bahut kam hoga, jisse train jaldi accelerate karegi aur travel time kam hoga. Germany me banaya gaya yeh naya aluminium third rail Kolkata aagaya hai aur Girish...
more...
Park aur Maidan stations pe installation shuru ho gaya hai. Is project ka aim agle do saal me 35 km third rail ko replace karna hai. Is upgrade se efficiency badhegi, operational cost kam hoga, aur aluminium third rail ki lifetime me 50,000 ton carbon emission kam hoga. Aluminium third rail ko kam maintenance ki jarurat hai, yeh zyada stable hai, aur tunnel me kam garmi produce karta hai. Yeh kaam raat me kiya ja raha hai taki regular service pe koi asar na pade.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy