It is high time that NDLS-LKO shares some of the load and responsibility with similar if not same speed as of NDLS-CNB. 493 km via MB-BE should have quality maintenance and travel time for 2 halts (MB,BE) train should be round 7 hours. An avg of 70 can be obtained while 130 MPS fit trains make it in 6 hours.